Laserfiche WebLink
<br />.' <br /> <br />~ <br /> <br />f <br /> <br />. <br /> <br />ARDEN TOWERS, INe. <br />3440 BAYSlDE ROAD <br />ORONO, MINNESOTA 55356 <br />952--413-3660 FAX952-413-31l80 <br /> <br />~,,..,~.-') <br />- i.::L:tJL <br /> <br />March 5, 2002 <br /> <br />Mr. Dave Schemel <br />City Building Official <br />City of Arden Hills <br />1245 West Highway % <br />Arden Hills, MN 55112-5794 <br /> <br />Dear Mr. Schemel: <br /> <br />As yon know, Arden Towers, Inc. presented to the City a final engineering report issued by <br /> <br />ElIresmann Engineering of yankton, South Dakota. The report also consisted of independent stndies by <br /> <br /> <br />. IlKS Associates and STS Consnltants, Part of Ihe investigation completed by HKS Associates involved <br /> <br />excavating down to all of the anchor points which are bnried np to 11 feel below the snrface. This <br /> <br /> <br />verification by IlKS Associates conclnded that the anchor points were in excellent condition. The analysis <br /> <br />of the soils by STS Consnltants detennined that the soils exceeded all requirements of the established <br /> <br /> <br />engineering standards. All of the studies condncted by these different experts in their respective fields <br /> <br /> <br />were independent and, as mentioned, were incorporated into the final report issued by Ehrcsm;nm <br /> <br />Engineering. <br /> <br /> <br />We nndertook and completed the consnl1.1tion of independent exper1s that was reqnested by the <br /> <br />City. <br /> <br />The three different engineering firms were retained for their expertise to provide objective <br /> <br /> <br />findings to tile City of Arden Hills. Anything less would not be accepted or tolerated by Arden Towers, <br /> <br />Inc. <br /> <br />e <br /> <br />Yon indicated that tbe city was planning to engage American Towers to do another study, It <br /> <br />should be noted that American Towers is a competitor of Arden Towers, tnc, <br /> <br /> <br />In our convers>,tion, 1 agreed to pay for np to $1,000.00 to engage a consntlant to assist in any <br /> <br />interpretation of the report and give yon the assurance that it was perfonned in accordance with applicable <br /> <br />engineering standards. Arden Towers. Inc. is not willing to participate in the cost of another stndy thai it <br /> <br />would consider rednndant, even to tile extent of $1,000,00, <br />