Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />City of Arden Hills <br /> <br />Chapter II Subdivisions <br /> <br />Subd. 2 Alternative. In the alternative, the City Council may authorize the execution <br /> <br />of a contract between the City and the subdivider requiring the subdivider to furnish <br /> <br />and to construct the improvements at the sole cost ofthe subdivider, in accordance with <br /> <br />plans and specifications and usual contract conditions approved by the Council, which <br /> <br />shall include provision for supervision of details of constrnction by the city engineer, <br /> <br />and grant to the engineer authority to correlate the work to be done under the contract <br /> <br />with other improvements in the subdivision which may be constructed by the City <br /> <br />under contract with others. The subdivider as contractor shall furnish a surety bond <br /> <br />with penalty equal to 1.25 times the cost of the improvements to be made under the <br /> <br />contract as estimated by the city engineer, which bond will be in form required by <br /> <br />statute for public contractors bonds and will identify the improvements and the time <br /> <br />schedule for their completion. <br /> <br />II40.05 Utilities. All utilities shall be installed underground as provided in this code. All <br /> <br />underground work shall be completed prior to street surfacing. <br /> <br />1140.06 Sidewalks. Sidewalks may be required along both sides of all streets; pedestrian ways <br /> <br />shall be paved and fenced as approved by the City Council. <br /> <br />1140.07 Curb and Gutter. Concrete curb and gutter shall be required. <br /> <br />11 - 43 <br />Public Hearing Draft <br />