Laserfiche WebLink
<br />URS <br />. <br /> <br />August 7,2002 <br /> <br />AGENDA ITEM S.D <br /> <br />Mr. Joe Lynch <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: 2002 Storm Drainage Improvements <br />Perry Park and Cummings Park <br /> <br />Dear Mr. Lynch: <br /> <br />Bids were received and opened for the above-referenced project on August 6,2002. Bids were <br />received from four (4) contractors. The tabulated bid outcome is as follows: <br /> <br />. <br /> <br />1 <br />2. <br />3. <br />4. <br /> <br />Contractor <br />Dryden Excavating, Inc. <br />Blacktop Repair Service, Inc. <br />Jay Bros., Inc. <br />Lametti and Sons, Inc. <br /> <br />Bid Amount <br />$66,500.00 <br />$67,845.00 <br />$70,431.50 <br />$166,150.00 <br /> <br />Engineer's Estimate <br /> <br />$68,000.00 <br /> <br />All bids had proper bid guarantees in the amount of ten percent (10%) of the total bid as required <br />by the Project Manual. A bid tabulation was performed to verify the total bid amounts and the <br />bid from Black top Repair Service Inc. was corrected to $67,845.00 from the $67,345.00 shown <br />on the bid proposal form. This correction does not affect the bid outcome. A copy of the bid <br />tabulation is attached for your information. <br /> <br />Dryden Excavating, Inc. submitted the low bid with a total base bid amount of $66,500.00. The <br />low bid is approximately $1,500.00 (2.2%) less than the Engineer's Estimate and reflects a <br />competitive bid in the current marketplace. <br /> <br />. <br /> <br />Thrasher Square <br />700 Third Street South <br />Minneapolis, M\I 55415-1199 <br />612.370.071J0 Tel <br />61~:.370.1378 Fax <br />