Laserfiche WebLink
<br />FACILmES IMPAOVBv1ENTS 2002-2012 <br /> <br />. <br /> <br />proaram Item NA ALTERNATIVE FACILITIES BONDING REfE'El'D.M <br /> HEAL THlSAFETY DEFERRED MAINT. 1- ACCESSIBILITY <br />ElectlMech. P .A. Svstem X I <br /> Clock $vc:tern X i <br /> Electrical uoarades X <br /> Air Conditionirvo ! $ 750000 <br /> Reliefs $ 10,000 <br /> DOC controls $ 50.000 <br /> I Hub foam climate control $ 10000 <br /> Remnerated drinkino fountains $ 2,500 <br /> Comnressed air $ 6,000 <br /> Condensate ournl'l , $ 8,000 <br /> DOC controls on air handlers $ 30 000 <br /> DOC controls on exhaust fans $ 10,000 <br />Site Sidewalks $ 5000 <br /> par1<in Lot $ 45 000 <br /> Drivewavc: $ 25,000 <br /> Plavnround surfacin $ 13.000 <br />Ene~ Air Lock entries X <br /> $lrvlinhts $ 60 000 <br /> Motion detectors $ 3000 <br /> Insulated Windows X <br /> Heat recoverv svstems $ 30 000 <br /> u;:;htintl DOC control $ 5,000 <br /> Boilers . $ 15000 ! <br /> Boiler Burners $ 55 000 <br /> Roof insulation X <br /> Hot water Heaters $ 6,000 <br /> ~onic Conversion $ 700,000 <br />KiUCate GeiJi...... X <br /> Enui"ment $ 30 000 <br /> Se~ Line X <br /> Cale acoustics $ 10000 <br /> Lunch tables $ 11 000 <br />Misc. Emernel'V'\/" nower $ 75,000 <br /> Garane for tractor/other , $ 15000 <br /> Portable toilel location $ 6000 <br />GRAND TOTAL $ 5 872 500 -. 11 033 466 $ 1 004 000 $ 25 840 000 <br /> <br />r <br /> <br />4/16/02 <br /> <br />Page 16 <br />