My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-26-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 08-26-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:23 PM
Creation date
11/13/2006 4:05:13 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Alternative Facility Bonding - $18 million to $20 million. These dollars <br />would need to be spent for health and safety, deferred maintenance, and <br />accessibility between fiscal year 2003 and fiscal year 2013. (see building by <br />building breakdown in attached materials) The cost to an average home is <br />approximately $52/year. <br />Facilities Levy Referendum - $18 million to $20 million for security <br />improvements, energy conservation, and facility upgrades to support current <br />and future programs. Placement of this issue on a fall 2002 ballot is <br />recommended, with work to commence in fiscal year 2004. Specific needs and <br />timelines are identified in the attached materials. Cost to the average home is <br />approximately $S8/year. <br />Facilities Levy Referendum - $3 million (4 year General Obligation <br />Equipment Certificates oflndebtedness) to upgrade technology and security <br />hardware and software throughout the district. Recommend placement on the <br />Fall ballot with work to start in fiscal year 2004. Specific items for consideration <br />can be found in the attached materials. Cost to the average home would be <br />approximately $42/year. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />At an earlier meeting Mr. Copt stated that he was apprehensive about the district's ability <br />to complete all the identified improvements within a short time frame. He noted that <br />there is the option oflevying over several years and feathering the construction projects <br />over a longer period oftime. This would allow for better project management and a <br />lessened tax burden, as not all levies would start at the same time. The combined tax <br />increase could be held to $IOO/year. Another option would be to lower the amount for . <br />the facilities levy referendum and come back in a few years for another vote to raise the <br />rest of the dollars. If this were the option, then we would identify those projects that <br />could be put off for a few years. <br /> <br />However, at our last meeting on April 22, 2002, the committee felt strongly that its <br />proposals should be seriously considered and that you (Dr. Thein) should ask the <br />Board and the public to approve its recommended amounts, since the needs will not <br />go away and any delay will result in increased costs and possibly emergency repairs. <br /> <br />We also felt that the district should hire a professional consultant to review the proposed <br />improvements and then would also assist in setting priorities. <br /> <br />Enclosures: Facility Needs Assessments <br />Facility Committee Membership <br /> <br />Folder: Facilities Study <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.