My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-30-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-30-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:27 PM
Creation date
11/13/2006 4:05:58 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />In plarming for the needs of the Guidant Campus, the architect had the opportunity to <br />maintain visibly compatible building heights by taking advantage of the lower elevation in <br />the southern portion of the campus. Buildings planned for the southern portion of the <br />campus will accommodate more of the capacity needs of the proposed campus and <br />therefore, be taller but will appear similar in height to the existing and proposed buildings <br />and ramps due to the lower grade elevation. <br /> <br />8. <br /> <br />PERMITS AND APPROVALS REQUIRED <br /> <br />EAW: <br />LIST ALL KNOWN LOCAL, STATE AND FEDERAL PERMITS, APPROVALS AND <br />FUNDING REQUIRED. <br /> <br />AUAR: <br />A listing oj major approvals likely to be required by the anticipated types oj development <br />projects should be given. This list will help orient reviewers to the idea that the AUAR <br />process is only one piece oj the regulatory Jramework that will protect environmental <br />resources. The list can also serve as a starting point Jor the development oj the <br />implementation aspects oj the mitigation plan to be developed as part oj the A UAR. <br /> <br />. <br /> <br />TABLE 3 <br />REQUIRED PERMITS AND APPROVALS <br /> <br />. <br /> <br />Unit of Government Permit or Approval <br />City of Arden Hills Preliminary and Final Plat Approval, Preliminary and <br /> Final Planned Unit Development Approval; Land <br /> Disturbance and Erosion Control Plan and Permit; <br /> Water Connection Permits; Building Permits; Street <br /> Vacation; Site Plan Reviews for Each Building <br />. <br />Rice Creek Watershed District Storm Water and Water Quality Plan Review and <br /> Approval; Minnesota Wetland Conservation Act <br /> Replacement Plan review and approval <br /> ..~ <br />Ramsey County Contiguous Plat Review <br />Ramsey County Department of Public Health Plan Review of any Food Services; <br />Small Quantity Hazardous Generator license <br />-.. .. <br />Metropolitan Council Permit for Utility Connection; <br /> Industrial Waste Discharge Permit <br />- -- <br />Minnesota Department of Transportation Contiguous Plat Review <br />. <br />Minnesota Pollution Control Agency NPDES Construction Permit <br /> .. <br />Army COIpS of Engineers Section 404 approval for wetland impacts, <br /> <br />Guidan! Campus Master Plan <br />Draft ADAR <br /> <br />- 8 - <br /> <br />September 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.