<br />. <br /> <br />. <br /> <br />. <br /> <br />Wetlands <br /> <br />Twelve wetlands were identified within the AUAR study area. Wetlands on the project <br />site were identified, characterized and delineated by Sanders Wacker Bergly, Inc. <br />The results of this work are presented in a Wetland Delineation Report dated <br />May 28, 2002. Twelve wetlands were identified on the site and labeled A, B, D through <br />K1, and K2 (see Figure 10). <br /> <br />Impacts to wetlands will be avoided where possible. Based on preliminary design <br />information, four of the twelve basins will be impacted with the Guidant Campus <br />expansion. A summary of the wetlands identified on the project site and proposed impacts <br />is presented Table 5. <br /> <br />TABLE 5 <br />WETLAND SUMMARY <br /> <br />Wetland Name Wetland Type Approximate Size of Approximate Area <br />Wetland ofImpact <br />Wetland A Deep marsh (Type 4/5) 0.4 Acre 0.3 Acre <br />Wetland B Wet meadow (Type 2) 0.2 Acre No Impact <br />Wetland D Shallow marsh (Type 3/4) 2.3 Acres No Impact <br />Wetland E Deep marsh (Type 4/5) 1.7 Acres No Impact <br />Wetland F Deep marsh (Type 4) 0.2 Acre No Impact <br />Wetland G Deep marsh (Type 4) 0.2 Acre No Impact <br />Wetland H Deep marsh (Type 4) 0.1 Acre No Impact <br />Wetland I Deep marsh (Type 4) 1.2 Acre No Impact <br />Wetland J Deep marsh (Type 4) 0.1 Acre 0.1 Acre <br />Wetland KI Shallow marsh (Type 2/3) 0.1 Acre 0.1 Acre <br />Wetland K2 Shallow marsh (Type 2/3) 0.1 Acre 0.1 Acre <br />Wetland VlJ Shallow Marsh (Type 3) 0.1 No Impact <br /> Total Area: 6.7 Acres(2) 0.6 Acre <br /> <br />(I) Wetland was not delineated, size and type are estimated. <br /> <br />(2) Not all of the wetlands lie entirely within the AUAR Study area boundary. <br /> <br />To comply with requirements of the Minnesota Wetland Conservation Act, wetland <br />impacts will be off set by creating mitigation at a 2: 1 ratio (2 acres of mitigation area for <br />each acre of impacted area). A detailed mitigation plan has not yet been developed, <br />however wetland mitigation will be accomplished by creating new replacement wetlands <br />on the project site. Existing wetlands located near the northwest comer of the site will <br />likely be enlarged to create new wetland area. <br /> <br />Guidant Campus Master Plan <br />DraftAUAR <br /> <br />- 16- <br /> <br />September 2002 <br />