My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-30-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-30-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:27 PM
Creation date
11/13/2006 4:05:58 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />18. <br /> <br />WATER QUALITY - WASTEWATER <br /> <br />EAW: <br /> <br />A. DESCRIBE SOURCES, COMPOSITION AND QUANTITIES OF ALL SANITARY, <br />MUNICIPAL AND INDUSTRIAL WASTEWATER PRODUCED OR TREATED AT <br />THE SITE. <br /> <br />B. DESCRIBE WASTE TREATMENT METHODS OR POLLUTION PREVENTION <br />EFFORTS AND GIVE ESTIMATES OF COMPOSITION AFTER TREATMENT. <br />IDENTIFY RECEIVING WATERS, INCLUDING MAJOR DOWNSTREAM WATER <br />BODIES, AND ESTIMATE THE DISCHARGE IMPACT ON THE QUALITY OF <br />RECEIVING WATERS. IF THE PROJECT INVOLVES ON-SITE SEWAGE <br />SYSTEMS, DISCUSS THE SUITABILITY OF SITE CONDITIONS FOR SUCH <br />SYSTEMS. <br /> <br />C. IF WASTES WILL BE DISCHARGED INTO A PUBLICLY OWNED TREATMENT <br />FACILITY, IDENTIFY THE FACILITY, DESCRIBE ANY PRETREATMENT <br />PROVISIONS AND DISCUSS THE FACILITY'S ABILITY TO HANDLE TIIE <br />VOLUME AND COMPOSITION OF WASTES, IDENTIFYING ANY <br />IMPROVEMENTS NECESSARY. <br /> <br />D. <br /> <br />IF THE PROJECT REQUIRES DISPOSAL OF LIQUID ANIMAL MANURE, <br />DESCRIBE DISPOSAL TECHNIQUE AND LOCATION AND DISCUSS CAPACITY <br />TO HANDLE THE VOLUME AND COMPOSITION OF MANURE, IDENTIFY ANY <br />IMPROVEMENTS NECESSARY, DESCRIBE ANY REQUffiED SETBACKS FOR <br />LAND DISPOSAL SYSTEMS. <br /> <br />AUAR: <br />Observe the following points of guidance in an A UAR: <br /> <br />. <br /> <br />Only domestic wastewater should be considered in an AUAR - industrial wastewater <br />would be coming from industrial uses that are excluded from review through an A UAR <br />process. <br /> <br />. <br /> <br />Wastewater flows should be estimated by land use sub-areas of the AUAR area; the <br />basis offlow estimates should be explained. <br /> <br />. <br /> <br />The major sewer system features should be shown on a map and the expected flows <br />should be identified. <br /> <br />. If not explained under Item 6, the expected staging of the sewer system construction <br />should be described, <br /> <br />. <br /> <br />The relationship of the sewer system extension to the RGU's comprehensive sewer plan <br />and ([or metro areas) to Metropolitan Council regional systems plans, including <br /> <br />Guidant Campus Master Plan <br />Draft AUAR <br /> <br />-24 - <br /> <br />September 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.