<br />Application for Payment: Itemization
<br />Schedule: A. WATER MAIN .
<br /> Uni\ Conlract Contract To~DilJte 'fo.Dale
<br />No. 118m UnIt Pllee Quanli1y AmDunt Quantity Amount
<br /> M081LIZATION Ls $5,500,00 1.00 $5,500.00 1,00 $5.500,00
<br />2021.S01
<br />2 ABANOON 8' OIP IN CASING LF $2.50 100.00 $250.00 0,00 $0,00
<br />2.104,50'
<br />3 REMOVE EXISTING 8" OIP WATER MAIN LF $2,50 1.260.00 $3,150.00 1.168.00 $2,920.00
<br />:?104.501
<br />4 OIRECTIONAL BORE 8" PEP WATER MAIN LF $29,50 170.00 $5,015.00 000 $0.00
<br />2503.541
<br />5 314" PVC WATER SERVICE LF $31,50 60,00 $1.890,00 5,00 $157,50
<br />ZSOi,603
<br />6 31" PVC SERVICE WITH CUR8 STOP EA $1.575.00 1.00 $1,575,00 1,00 $1.576,00
<br />2503.600
<br />7 6' PVC WATER MAIN LF $50.00 10.00 $500 .00 10.00 $500.00
<br />2503,003
<br />8 e' PVCWATER MAIN LF $29,50 1.120,00 $33,040.00 1.168,00 $34.456,00
<br />2S03.60J
<br />9 DIP FITTINGSNlAAPPEO LB $4.00 500.00 $2,000,00 500.00 $2,000.00
<br />2604.602
<br />10 INSTALL HYDRANT 18' G~TE VALVE EA $4,200.00 1.00 $4,200.00 1.00 $4.200.00
<br />251;)1,602
<br />11 CONNECT TO EXISTING EA $2,625.00 2,00 $5,250,00 2.00 $6,250.00
<br />~SO"'.60~
<br />12 TR~FFIC CONTROl LS $2,100.00 1,00 $2.100,00 1.00 $2.100,00
<br />2553.801 .
<br />13 BALE CHECK EA $0.01 50.00 $0.50 0,00 $0,00
<br />2573,501
<br />14 SOD WITH 4' TOPSOIL sy $0,01 1,110.00 $11.10 0,00 $0.00
<br />2S;tr;.Wl
<br />15 SIL HENCE LF $2,00 200.00 $400.00 000 $0.00
<br />2575.502
<br />16 SEEDING WITH MULCH AC $1,00 0,60 $0,60 0.00 $0.00
<br />2575.505
<br /> Subtotal: $84.882.20 $58.656,50
<br />Schedule: B - SANITARY SEWER RELINING
<br /> Unit Contract Contract To-Date To-Date
<br />No. Item Unit Pric:e O"ontily Amount Quantity Amount
<br />1 MOBlllZA nON LS $1,330,00 1.00 $1.330.00 1.00 $1.330.00
<br />2021501
<br />2 10" VCP RELINE LF $26,00 1,380.00 $35,680,00 0.00 $0.00
<br />0000,000
<br />3 12" VCP RE-LINE LF $26.00 600.00 $15,600,00 0.00 $0.00
<br />0000.006
<br />4 REMOVE MANHOLE STEPS EA $50,00 35.00 $1,750.00 0.00 $0.00
<br />2104.509
<br />5 INSTALL MANHOLE STEPS EA $61,00 35,00 $2,635.00 0.00 $0.00
<br />~50~.60:!
<br />6 REBUilD MANHOLE INVERT EA $1.100.00 3.00 $3,300.00 000 $0.00
<br />2S0~,60Z
<br />7 ~DJUST RINGS AND CASTING EA $525.00 9.00 $4.725.00 9,00 $4.725,00 .
<br />2506..6.02