My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-18-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 11-18-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:31 PM
Creation date
11/13/2006 4:06:50 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Page 3 <br />November 13,2002 <br /> <br />Lexilll!ton Avenue Improvements <br /> <br />Ramsey County is also preparing to reconstruct the portion of Lexington Avenue that extends <br />from Victoria Avenue in Shoreview to Highway 96. This is anticipated to be a 2004 project. <br />The Council will note the following: <br /> <br />· The road will be expanded from two lanes to four lanes in both directions. <br />· A signal will be installed at the intersection of Victoria and Lexington. This will be <br />coordinated with the signal at Cummings Park Drive (currently Guidant Drive North). <br />· In the past, residents from the Karth Lake neighborhood have indicated that they would <br />like a signal at Amble. The County has indicated that this intersections does not warrant <br />a signal. The County has indicated that they would provide turning lanes to Ambel. If <br />the City was interested in having a light in this area it would be entirely the City's <br />expense. This would cost approximately $300,000. <br />· There will be a nominal increase in the amoUnt of impervious surface in conjunction with <br />the reconstruction. Given the previously identified concerns with the Karth Lake water <br />level, this issue will require further attention and discussion as the project proceeds. <br />· The trail along Lexington in this area will be reconstructed at the County's expense. <br /> <br />Since the project has not been engineered at this point, there are no drawings attached for <br />reference. It is anticipated that a neighborhoo!f meeting will be held in the future once <br />preliminary engineering for the project has been completed. <br /> <br />Requested Action <br /> <br />Provided for informational and discussion purposes <br />
The URL can be used to link to this page
Your browser does not support the video tag.