My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-09-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 12-09-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:35 PM
Creation date
11/13/2006 4:07:08 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. ": '1DJ~29-2001 12:00 <br /> <br />~(. <br />) <br /> <br />~ <br /> <br />-(a <br />~. <br />...7 <br /> <br />BRW <br /> <br />612 J7J 5525 P,01/01 <br /> <br />r <br /> <br />URS <br /> <br />MEMORANDUM <br /> <br />Thrtsher Square. <br />700 Third Slt~l Soulh <br />MinncMpolillO, MN 55415 <br />Phone: (612) 370-0700 <br />fax: (612) 370-1378 <br /> <br />To: <br /> <br />Aaron Parrish, <br />Arden Hill City Planner <br /> <br />Copy: Greg Brown, URS File: <br /> <br />37951-005-2001 <br /> <br />From: <br /> <br />Nick Landwer, PE <br /> <br />Date: <br />Subject: <br /> <br />November 29, 2001 <br />County Road D and Cleveland Avenue Site Plan, Plan Review <br /> <br />J have reviewed the site plan for the proposed development on the northeast COmer of the <br />intersection of County Road D and Cleveland Avenue, Following are my comments: <br /> <br />I. II appears there could be potential drainage problems with the drainage/grading design. The <br />proposed drainage design has subStanlial amount of site runoff flowing from the driveway <br />entrances into County Road D and Cleveland Avenue, Runoff from the site.into the <br />roadways should be limited by modifying the proposed grade or by adding eatchbasins. <br /> <br />There is also a concern of potential flooding of the properties to the north from the site runoff <br />via the ditch on the nonh ~ide of the property, An alternative collection area could be a swale <br />in Ihe boulevard at the intersection corner wilh an oullet piped to the e~isting stonnsewer, <br /> <br />The developer should submit existing and proposed drainage calculations for the site runoff <br />to the City Engineer for review. <br /> <br />2. Rice Creek Watershed District will require the developer to apply for a drainage permit and <br />provide for stOllJJwater runoff lrealmcn!, <br /> <br />3, The developer should submit a detailed utility plan, <br /> <br />4. Details are not dear on the heighls of the proposed retaining walls, Some of the taller <br />sections of wall will require safety railings. <br /> <br />5. The proposed area drain in the lower level will be required to drain into the storm drainage <br />system. A detail of the .connection should be included in the utility plan, It appears tbat a <br />sump pump will be required for Ihis drain, This shall not he connected to the sanitary sewer <br />scrVJCC. <br /> <br />6. The ramp on the west side of the proposed building is vcry ste,ep at 12.75%. This ramp <br />should not be used for public access, <br /> <br />TOTAL P,Ol <br />
The URL can be used to link to this page
Your browser does not support the video tag.