Laserfiche WebLink
<br />. <br /> <br />a. <br /> <br />Site Grading Improvements shall be completed on or before the 1 st day of <br />November, 2003, <br /> <br />b. Turf restoration improvements shall be completed on or before the 1st day <br />of November, 2003, <br /> <br />2, Landscaping, Developer shall complcte all landscaping improvements on or <br />before the 1st day of November, 2003, as illustrated in Exhibit B, <br /> <br />3, Storm Sewer. Storm sewer improvements include all neces8ary storm sewers, <br />catch basins, culverts, and other apparatus and ponding areas, Developer shall <br />obtain all appropriate permits from the Rice Creek Watershed District. Storm <br />sewer improvements shall be completed by the I st day of November, 2003, as <br />illustrated in Exhibit B, <br /> <br />4. Public and Internal Access Roads. Street improvements include subgrade <br />preparation, gravel base, bituminous surfacing, raised medians and bituminous <br />curb, as illustrated in Exhibit B and shall be completed prior to the issuance of <br />occupancy permits for the building on the Cub Foods Site, <br /> <br />a. <br /> <br />Grey Fox Road: Grey Fox Road and its intersection with Lexington <br />Avenue shall be improved in compliance with plans and specifications <br />approved by the :Ramsey County Traffic Engineer and the City Engineer, <br /> <br />. <br /> <br />b. <br /> <br />Direct Access from Lexington A venue: The direct access from Lexington <br />Avenue directly onto Developer's property shall be constructed in <br />accordance with plans and specifications approved by the Ramsey County <br />Traffic Engineer. <br /> <br />c. Raised Median: A raised median shall be constructed north of the railroad <br />tracts on Lexington Avenue and south ofthe access from Lexington <br />Avenue directly onto the Developer's site, in accordance with plans and <br />specifications approved by the Ramsey County Traffic Engineer. <br /> <br />d, Shannon Square Access: An access road to the west and south sides of the <br />Shannon Square Site shall be constructed prior to the issuance of an <br />occupancy permit for the building on the Cub Foods Site. <br /> <br />5. Sanitary Sewer. Sanitary sewer improvements include sanitary sewer mains, <br />connections and appurtenances. Sanitary sewer improvements shall be completed <br />by the 1 st day of November, 2003, as illustrated in Exhibit B, <br /> <br />6. <br /> <br />Water Main. The water main improvements include water mains, connections and <br />appurtenances. Water main improvements shall be completed by the 1 st day of <br />November, 2003, as illustrated in Exhibit B. <br /> <br />. <br /> <br />2 <br />