Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />II. <br /> <br />BUILDING CONSTRUCTION <br /> <br />Building Permits Fees are based upon Table lA <br /> of the 1997 VB.C. and are <br /> determined by the City's <br /> Building Official. <br />Plan Review Fee 65% of Building Permit Fee <br />Re- Insnection $20.00 <br /> STATE SURCHARGE .0005 x construction value <br /> <br />Mobile Home $50.00 <br />Location Permit <br />Demolition Includes: Wrecking, 50.00 <br /> relocating and moving <br /> buildings (for all types of <br /> buildings, including mobile <br /> home relocation) <br />Swimminl! Pool 50.00 <br /> STATE SURCHARGE 0.50 <br /> <br />III. ZONING PERMITS <br /> <br />Fence Construction Base Fee $15.00 <br /> Plus Per 100 Feet 6.00 <br /> <br />Blacktop or Base Fee $18.00 <br />Concrete Sidewalks, <br />Parking Lots, <br />Drivewavs <br /> Plus Per 100 Feet 6.00 <br /> <br />Plumbim~ Minimum Fee $35.00 <br />. Residential 1.25% of Bid <br />. Commercial, 1.25% of Total Bid <br /> Industrial, plus $50.00 <br /> Institutional <br /> STATE SURCHARGE **0.50 <br /> **Surcharge computation is based on the permit fee. <br /> Surcharge eauals 0.0005 of each nermit fee, or $.50, whichever is greater. <br /> <br />Res. #01-28, Adopted 12/17/01 - Effective 1/1/02 Page 3 <br />