Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />e <br /> <br />Air Conditioning/Refrigeration Work: <br />First Five Tons (Air Conditioner - 60,000 BTU). . . . . . . . , . . . . . . . . . . . . . . $20,00 <br />Each Additional Ton (12,000 BTU), . . . . . . , . , , . , . . . . . . . . . . , . . , . , , . . 2.00 <br />First Five Tons (Duct Work - 60,000 BTU). , . . , . . , . . . . , . . , . . , . , . . . . 25.00 <br />Each Additional Ton (12,000 BTU) , . . . . . . . . . . . . . . , . . . . , . . . . . . . . . , 3.00 <br />Ventilating Systems: <br />Each Bathroom Exhaust Fan. . . . . . . , . , . . . . . . . . . . . . , . . , . , . . . . . , . . <br /> <br />Minimum Fee. . . . . . . . , , . . . . . . . . . . . . , . . , . . . . , . . . , . , . . , . . , ' . . . . , . , . . <br />Inspections <br />NEW: Case-by-case Basis, Refer to Inspector <br />ADDITIONS: Case-by-case Basis, Refer to Inspector <br /> <br />5.00 <br />25.00 <br /> <br />Commercial, Industrial and Instructional Mechanical Permit <br /> <br />Fee. . . . . . . . . . . . , . . . . . . . , . . . . . . . . . , . . , . . . . . . . . . . . . . . , . . , . . . , . , . . . . . $50.00+ <br />1-114% (0.0125 x value) total valuation of project <br />State Surcharge. . . . , . , . , . . . . . . . . . . . . . . . . , . . . . . , , . , . $.50/$1,000 (0.0005 x value) <br />valuation of project <br />(Value of work must include the cost of installations, alterations, additions or repairs <br />including fans, hoods, HV AC units and heat transfer units, and all labor and materials <br />supplied by the contractor, In addition, it shall include all materials and equipment supplied <br />by other sources when these materials are normally suppplied by the contractor) <br /> <br />admin, lfinancel 1 997fees.wpd <br />