Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Resolution No. 98-71 <br /> <br />November 30, 1998 <br /> <br />Residential, Commercial, Industrial and Institutional Heating or Mechanical Permit <br />Based upon value of mechanical contractor bid <br />Residential............... .......................................................................... 2% of total bid <br />CommerciallIndustrial/Institutional.............................................. * 1.5% of total bid <br />* + $50.00 <br /> <br />Minimum Fee............................................ ...................................... <br />STATE SURCHARGE............................................................ .... <br />* Surcharge computation is based on the permit fee. Surcharge <br />equals .0005 of each permit fee, or $.50, whichever is greater. <br /> <br />Fire Protection Permit <br />The fees are based upon Table 1.A ofthe 1997 U.B.C. and are to be determined by the <br />City's Building Inspector. <br /> <br />M:IUSERSISIIEILA ICOUNCILIRESOLUT\99FEES. WPD <br /> <br />35.00 <br />*50 <br />