My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-10-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 02-10-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:09 PM
Creation date
11/14/2006 2:34:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br /> <br />Agenda Item 7 A.1 <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone; (612) 370-0700 <br />Fax; (612) 370-1378 <br /> <br />To: <br /> <br />Mr. Joe Lynch! City Copy: <br />of Arden Hills <br /> <br />Nick LandwerlURS <br />Tom Moore/AH <br /> <br />File: <br /> <br />379510055001 <br /> <br />From: <br /> <br />Greg Brown <br />Arden Hills City Engineer <br /> <br />Date: <br /> <br />February 5, 2003 <br /> <br />Subject: <br /> <br />2002 Sanitary Sewer Rehabilitation Scope <br /> <br />Background <br />The City of Arden Hills awarded Visu-Sewer Clean & Sea] of Frid]ey, MN the 2002 Sanitary Sewer and <br />Watennain Rehabi]itation Project on August ]2,2002 for a total contract amount of$246,435.50. The <br />project consists of three general elements of work: replacement of ]200 feet ofwatermain and structural <br />lining of 2,000 feet of sanitary sewer along Old Highway] 0 and the sealing of pipe joints in the southwest <br />quadrant of the City. The structural watermain and sanitary sewer work is complete and operational and <br />was completed within budget. The contractor continues to perform joint sealing in the southwest quadrant <br />of the City bound by County Road D, Cleveland A venue, Lake Johanna and Stowe Avenue. Pipe joint <br />sealing is done to eliminate the inflow of groundwater into the sanitary sewer system and thus reduces the <br />City's volume of discharge (and cost) to the Metropolitan Council wastewater treatment plant. <br /> <br />The original budget was not based upon completing a geographical area but arbitrarily selected as an <br />annual amount to be expended for pipe sealing work. The pipes in this area have required more grout than <br />expected which indicates that a large amount of infiltration is occurring here and the contract budget will <br />be exhausted before this quadrant of the City is completed. The nature of this type of work allows us to <br />stop at any time, therefor we are not in danger of overrunning the contract amount. We do have an <br />opportunity to utilize the favorable unit prices of this contract to continue sealing pipes in this quadrant of <br />the City. Based upon the amount of pipe left to seal and the rate of grout used to date, we anticipate that an <br />additional $85,000 would complete the southwest quadrant of the City. <br /> <br />The Sanitary Sewer Enterprise Fund currently has a balance of approximately 2.3 million dollars. <br /> <br />Recommendation <br />Considering the benefit the City realizes by reducing infiltration into our system, the condition of the <br />sewers in the southwest quadrant and the significant balance in the enterprise fund, the city Engineer <br />recommends that Council authorize the preparation of a change order to the 2002 Sanitary Sewer <br />Rehabilitation Project to complete the sealing of the pipe joints in the southwest quadrant. <br /> <br />PROJECTSIARDENH1L\3795I IGENERAL\DocumentslAgenda Memo 2-10-03 Item 7 A I doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.