My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-18-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 02-18-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:11 PM
Creation date
11/14/2006 2:34:12 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to City Council <br />January 17,2003, Ramsey County Public Works Facility Cost Comparison <br />Page 2 of2 <br /> <br />Conclusions <br />Staff has concluded that the total amount of heated and unheated space is not significantly <br />different from one study to another. The heated space, Administration, under TKDA was 3,914 <br />sq. ft. and under Ramsey Co./BWBR was 3,974 sq. ft. The vehicle space under TKDA was <br />17,714 sq. ft. and under Ramsey Co./BWBR was 17,070 sq. ft. The total for both under the <br />TKDA was 21,628 sq. ft. and under Ramsey Co./BWBR was 2 1,040 sq. ft. <br /> <br />The most obvious difference was the cost differential on a square foot basis. In the TKDA space <br />study, the average cost for the heated space was $103.00 per sq. ft. and the amount identified <br />under the Ramsey Co./BWBR study was $ I 22.00 per sq. ft., an 18% cost increase. <br /> <br />The same can be said for cold storage. The areas are relativcly the same. Under TKDA, it was <br />2,261 sq. ft. and under Ramsey Co./BWBR was 2,984 sq. ft. The most obvious difference was the <br />price on a square foot basis. On the TKDA study, cold storage was $36.05 per sq. ft. and Ramsey <br />Co/BWBR was $52.44 per sq. ft, a cost increase of 45%. <br /> <br />The largest difference was found in the site and out building work space. TKDA has parking and <br />out work at $14,040.00, Ramsey Co./BWBR at $574,487.00. This is a cost increase of 4,000%. <br /> <br />e <br /> <br />e <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.