Laserfiche WebLink
<br />Application for Payment: Itemization <br />.hedule: A - WATER MAIN <br /> Unit Contract Contract To-Date To-Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br />1 MOBILIZATION LS $5.500.00 1.00 $5,500.00 1.00 $5,500.00 <br />2021.501 <br />2 ABANDON 8" DIP IN CASING LF $2.50 100.00 $250.00 0.00 $0.00 <br />2104.501 <br />3 REMOVE EXISTING 8' DIP WATER MAIN LF $2.50 1,260.00 $3,150.00 1,168.00 $2,920.00 <br />2104.501 <br />4 DIRECTIONAL BORE 8' PEP WATER MAIN LF $29.50 170.00 $5,015.00 149,16 $4.400.22 <br />2503.541 <br />5 314' PVC WATER SERVICE LF $31.50 60,00 $1,B90.00 5,00 $157.50 <br />2503.603 <br />6 314' PVC SERVICE WITH CURB STOP EA $1,575.00 1,00 $1.575,00 1.00 $1.575.00 <br />2503.603 <br />7 6' PVCWATERMAIN LF $50,00 10,00 $500.00 10.00 $500.00 <br />2503.603 <br />8 8' PVC WATER MAIN LF $29,50 1.120,00 $33.040,00 1.16B.00 $34,456.00 <br />2503.603 <br />9 DIP FITTINGSlWRAPPED LB $4,00 500,00 $2.000.00 500.00 $2.000,00 <br />2504.602 <br />10 INSTALL HYDRANT 16' GATE VALVE EA $4.200.00 1.00 $4.200.00 1.00 $4,200.00 <br />2504.602 <br />11 CONNECT TO EXISTING EA $2,625,00 2.00 $5.250.00 2.00 $5.250.00 <br />2504.602 <br />. TRAFFIC CONTROL LS $2.100.00 1,00 $2.100.00 1.00 $2,100,DO <br />,601 <br />13 BALE CHECK EA $0.01 50.00 $0,50 0.00 $0,00 <br />2573.501 <br />14 SOD WITH 4' TOPSOIL SY $0.01 1,110.00 $11.10 1.110.00 $11.10 <br />2575.501 <br />15 SIL TFENCE LF $2.00 200.00 $400.00 0.00 $0.00 <br />2575.502 <br />16 SEEDING WITH MULCH AC $1.00 0.60 $0,60 0.60 $0.60 <br />2575.505 <br /> Subtotal: $64,BB2.2O $63,070.42 <br />Schedule: B - SANITARY SEWER RELINING <br /> Unit Contract Contract To-Date To-Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br />1 MOBILIZATION LS $1,330.00 1.00 $1.330.00 1.00 $1,330.00 <br />2021.501 <br />2 10' VCP RELINE LF $26.00 1,3BO.00 $35,BBO,00 1.37B.00 $35.82B.00 <br />0000.000 <br />3 12' VCP RHINE LF $26,00 600.00 $15,600.00 612.00 $15,912.00 <br />0000.000 <br />4 REMOVE MANHOLE STEPS EA $50,00 35.00 $1.750,00 45,00 $2,250.00 <br />2104.509 <br />5 INSTALL MANHOLE STEPS EA $81,00 35.00 $2.835.00 30.00 $2.430.00 <br />2503.602 <br />..602REBUILD MANHOLE INVERT EA $1.100,00 3.00 $3.300.00 0.00 $D.OO <br />7 ADJUST RINGS AND CASTING EA $525.00 9.00 $4.725.00 9,00 $4.725.00 <br />2506.602 <br /> Page 3 of 5 <br />