My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-31-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 03-31-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:18 PM
Creation date
11/14/2006 2:34:55 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I"" <br />~. , <br /> <br /> <br /> <br /> <br />_ <br /> <br />_ <br /> <br />_ <br /> <br />Ouidant Corporation <br />Campus Master Plan <br />Land Use Application - Description Request <br />February 3, 2003 <br /> <br />Description of Request (supplement) <br /> <br />1) Ouidant is requesting the approval of the final plat of GUIDANT FIRST ADDITION and <br />vacation of various utility and road easements along Femwood Avenue. <br /> <br />2) Guidant is reqUesting an amendment to its Campus Master Plan P.U.D. The purpose of the <br />amendment is to allow the re-orientation of Building L and Building K in order to create a <br />more aesthetieally pleasing future main arrival point for the campus. Ouidant is also <br />requesting an increase in building area of Building L from 108,000 square feet to 112.000 <br />square feet. Initially, in the spring of 2002, Building L received site plan approval for <br />111,000 square feet. As a result of re-orienting buildings 'L' and 'K' the following <br />modifications will also be made to building 'M': a) reduce building area from 138,600 square <br />feet to approximately 130,000 square feet. b) reduce the building footprint by 6,300 square <br />feet. c) rotate the building 90 degrees. Refer to the revised Campus Plan drawing submitted <br />with this application. <br /> <br />3) Guidant is requesting site plan approval for Addition '1'. This project is a two story, 54,000 <br />square foot addition to existing buildings 'D' and 'E'. There will be a small mechanieal <br />penthouse above a portion of the second floor. The project will provide for research and <br />office space. <br /> <br />4) Ouidant is requesting site plan approval for Building 'L'. This project is a three story, <br />112,000 square foot building. It will be connected to existing building 'F' but will be <br />considered a separate building by building code standards. There will be amechanieal <br />penthouse above a portion of the third floor. This project will provide space for Ouidant <br />employee training as well as a small number of visiting physicians. <br /> <br />Page I of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.