Laserfiche WebLink
<br />, <br /> <br />'''Ii, . <br />," <br /> <br />. <br /> <br />. <br /> <br />ADMINISTRATIVE <br />BUILDING <br /> <br />. <br /> <br />Guidant Corporation <br />Campus Master Plan <br />Arden HiUs, Minnesota <br /> <br />The plaza to the south of lhe Training Center is a prectlffiOr to the new main entry court which will be <br />formed when lhe proposed Administrative Building is constructed. The plaza to lhe north will provide <br />outdoor seatilll and walking paths as well as new landscaping. In addilion, new grading, paving, and <br />landscaping will form a servk:e court to lhe west of Building F and screen the existing dock doors and <br />service area there. <br /> <br /> <br />Training Center site, showing new plazas and landscapiAg <br /> <br />The new administrative buikling, labeled as Building K in the master plan, will serve to unify and <br />cenlralize Guidanfs administrative functions, which are currenUy divided amongst various buiklings on <br />campus. Design for this structure is proposed to begin in 2004. It is anticipated thallhe Administrative <br />Buikling will employ materials similar to those exhibled in lhe design of the Training Center. Though <br />. pictured on lhe left in lhe previous rendering of lhe Training Center, this image is meant to roughly <br />represent only the site and wlume of the building. The building ilsell remains to be designed. <br /> <br />October 2002 <br /> <br />Paga17 <br />