Laserfiche WebLink
<br />- <br /> <br />e <br /> <br />e <br /> <br />work shall be done with forces which are adequate to insure the <br />satisfactory collection and disposal of said materials at all times and the <br />failure to perform may be excused only by adverse conditions of weather <br />and similar hindrances which in other work might be regarded as "act of <br />providence", In the case of such event, the Contractor will notilY WCCO <br />Radio and KSTP Radio by 6:00 a.m. to announce postponement and <br />provide informatiou for a substitute date. <br /> <br />2.4 The Contactor will conduct a phone survey each year. The results of the <br />survey shall be given to the City Administrator. <br /> <br />3. CoUection <br /> <br />3.1 Recyclable materials shall be prepared as follows: <br /> <br />Magazines. Newsvrint. Mixed Mail: Place in paper bag or recycling container. <br />Keep separate from cans, glass, and plastic. <br /> <br />Cans. Glass. Plastic Bottles with a neck: Rinse out & place in paper bag or <br />recycling container. Keep separate from paper items. Plastic items remove <br />caps and lids and flatten. <br /> <br />Cardboard: Flatten, place in container or bundle with twine, Not to exceed 3ft <br />X 3ft. <br /> <br />Aerosol Cans: Must be completely drained. <br /> <br />3.2 All recyclable materials placed for collection shall be owned by and the <br />Responsibility of the occupants or residential properties until they are <br />handled by the Contractor. Upon handling of the containers and recyclable <br />materials by the Contractor, the recyclable materials become the property <br />and responsibility of the Contractor. <br /> <br />3.3 Recyclable materials deemed unacceptable by the Contractor according to <br />the Preparation procedures in provision 3.1 the Contractor will leave a <br />notice with the occupant. <br /> <br />3.4 The Contractor's employees shall save for the resident' any containers that <br />are Marked Save. These containers, once emptied, shall be returned to the <br />curbside. Any spills will be cleaned up inunediately by the Contractor. <br /> <br />4. <br /> <br />Contractor's EQuiument <br />