My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-09-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 06-09-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:27 PM
Creation date
11/14/2006 2:36:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />URS <br />. <br /> <br />June 4, 2003 <br /> <br />AGENDA ITEM 7.A <br /> <br />Mr. Aaron Parrish <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: 2003 Seal Coating Project <br /> <br />Dear Mr. Parrish: <br /> <br />Bids were received and opened for the above-referenced project on June 3, 2003. Bids were <br />received from three (3) contractors. The tabulated bid outcome is as follows: <br /> <br />. <br /> <br />1 <br />2. <br />3. <br /> <br />Contractor <br />Pearson Bros., Inc. <br />Allied Blacktop <br />Astech Corp. <br /> <br />Bid Amount <br />$33,300.64 <br />$39,550.91 <br />$56,013.38 <br /> <br />Engineer's Estimate <br /> <br />$50,000.00 <br /> <br />All bids had proper bid guarantees in the amount of ten percent (10%) ofthe total bid as required <br />by the Project Manual. A bid tabulation was performed to verify the total bid amounts and all <br />bids were found to be correct. A copy of the bid tabulation is attached for your information. <br /> <br />Pearson Bros., Inc. submitted the low base bid with a total base bid amount of $33,300.64. The <br />average bid prices is approximately 16% less than the Engineer's Estimate and reflects an <br />extremely competitive bid in the current marketplace. <br /> <br />Recommendation <br />The Engineer has not worked with Pearson Bros., Inc. but has checked and been given positive <br />references. The Engineer is confident that Pearson Bros., Inc. is capable of successfully <br />completing the work included with this project. <br /> <br />. <br /> <br />The City Engineer, therefore, recommends the award of the 2003 Seal Coating Project to Pearson <br />Bros., Inc. for the total amount of $33,300.64. The project schedule outlined below is based upon <br />award by the City Council on June 9, 2003. <br /> <br />Thresher Square' 700 Third Street South. Minneapolis, MN 554]5' Phone: (6]2) 370-0700' Fax: (6]2) 370-1378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.