Laserfiche WebLink
<br />7. <br /> <br />9. <br /> <br />8. <br /> <br />Any applicable permits shall be filed with Ramsey County, the Rice Creek <br />Watershed District, the Minnesota Pollution Control Agency, and other regulatory <br />agencIes. <br />That the building material variance as outlined in Item No. 13, of the staff report <br />dated March 26, 2003, meet the approval of the City Planner and Building <br />fuspector, and that additional design features, that break up the cold <br />storage/screening wall with changes in relief, material, setbacks, and/or color, be <br />included in the variance and also receive the approval of the City Council. <br />That the oil and sand location on the site plan be deleted and the waste oil drop <br />off be incorporated into the existing County waste oil storage on the site and the <br />County come up with an acceptable method to convey that waste oil into their <br />container. If that is deemed unworkable the County shall come back to the City to <br />amend their site plan. <br />That the landscape plan include landscaping to the west side of the building not <br />knowing when the National Guard will build their facility. The County agrees to <br />the provision of additional screening, acceptable to both the County and the City, <br />at such time as the City deems that future development of the TCAAP property <br />warrants such screening. <br />Based upon development of the property in compliance with Conditions 1-10 <br />above and the approved site plan, the City Council finds that health, safety, <br />convenience, and general welfare of the owners and occupants of surrounding <br />land, in particular, and the community in general, will not be adversely impacted. <br /> <br />10. <br /> <br />11. <br /> <br />Subsequently, the Council discussed potential revtslons to the design of the cold <br />storage/screening wall at the May 15, 2003 Council Work Session. Potential revisions discussed <br />included additional windows (intended to break up the long spans of concrete along the wall) and <br />using different styles of precast concrete (textured/ribbed precast had been proposed versus the <br />smooth precast surface that was utilized at Irondale High School). <br /> <br />Ramsey County has submitted revised elevations showing the addition of several windows to the <br />cold storage/screening wall. A copy of the revised elevation has been attached for your review. <br /> <br />Attachments <br /> <br />6C- I Revised elevation of the cold storage/screening wall <br /> <br />PC #03-08- CC Memo 06130/2003 - Page 2 of 2 <br /> <br />( <br /> <br />. <br /> <br />. <br /> <br />. <br />