|
<br />Application for Payment: Itemization
<br />ehedule: A - WATER MAIN
<br /> Unit Contract Contract To-Date To-Date
<br />No. Item Unit Price Quantity Amount Quantity Amount
<br />1 MOBILIZATION LS $5,500.00 1.00 $5,500.00 1.00 $5,500.00
<br />2021.501
<br />2 ABANDON 8' DIP IN CASING LF $2.50 100.00 $250.00 0.00 $0.00
<br />2104.501
<br />3 REMOVE EXISTING 8' DIP WATER MAIN LF $2.50 1,260.00 $3,150.00 1,168.00 $2,920.00
<br />2104.501
<br />4 DIRECTIONAL BORE 8' PEP WATER MAIN LF $29.50 170.00 $5,015.00 149.16 $4,40022
<br />2503.541
<br />5 3/4' PVC WA TEA SERVICE LF $31.50 60.00 $1 ,890.00 5.00 $157.50
<br />2503.603
<br />6 3/4' PVC SERVICE WITH CURB STOP EA $1,575.00 1.00 $1,575.00 1.00 $1,575.00
<br />2503..603
<br />7 6' PVC WATER MAiN LF $50.00 10.00 $500.00 10.00 $500.00
<br />2503.603
<br />8 8' PVC WATER MAIN LF $29.50 1,120.00 $33,040.00 1,168.00 $34,456.00
<br />2503.600
<br />9 DIP FlmNGSIWRAPPED LB $4.00 500.00 $2,000.00 500.00 $2,000.00
<br />2504.602
<br />10 INSTAUl HYDRANT 16' GATE VALVE EA $4,200.00 1.00 $4,200.00 1.00 $4,200.00
<br />2504.602
<br />11 CONNECT TO EXISTING EA $2,625.00 2.00 $5,250.00 2.00 $5,250.00
<br />2504.602
<br />. TRAFFIC CONTROL LS $2,100.00 1.00 $2,100.00 1.00 $2,100.00
<br /> 3.601
<br />13 BALE CHECK EA $0.01 50.00 $0.50 0.00 $0.00
<br />2573.501
<br />14 SOD WITH 4' TOPSOIL SY $0.01 1,110.00 $11.10 1,110.00 $11.10
<br />2575.501
<br />15 SIL TFENCE LF $2.00 200.00 $400.00 0.00 $0.00
<br />2575.502
<br />16 SEEDING WITH MULCH AC $1.00 0.60 $0.60 0.60 $0.60
<br />2575.505
<br /> Subtotal: $64,88220 $63,070.42
<br />Schedule: B, SANITARY SEWER RELINING
<br /> Unit Contract Contract To-Date To-Date
<br />No. item Unit PrIce Quantity Amount Quantity Amount
<br />1 MOBIUZATlCN LS $1,330.00 1.00 $1,330.00 1.00 $1,330.00
<br />2021.501
<br />2 10' VCP RELINE LF $26.00 1,380.00 $35,880.00 1,378.00 $35,628.00
<br />??oo.000
<br />3 12' VCP RHINE LF $26.00 600.00 $15,600.00 612.00 $15,912.00
<br />??oo.000
<br />4 REMCVE MANHOLE STEPS EA $50.00 35.00 $1,750.00 45.00 $2,250.00
<br />2104.509
<br />5 INSTALL MANHOLE STEPS EA $81.00 35.00 $2,835.00 30.00 $2,430.00
<br />~602
<br /> .602 REBUILD MANHOLE INVERT EA $1,100.00 3.00 $3,300.00 0.00 $0.00
<br />7 ADJUST RINGS AND CASTING EA $525.00 9.00 $4,725.00 9.00 $4,725.00
<br />2506.602
<br /> Page 3 ol5
<br /> ~--_._. - ~
<br />
|