Laserfiche WebLink
<br />Application for Payment: Itemization <br />ehedule: A.ROADWAY <br /> Unit Contract Contract To--Date To-Date <br />No. item Unit Price Quantity Amount Quantity Amount <br />1 MOBILIZATION LS $8.000.00 1.00 $8,000.00 1:00 $8,000.00 <br />202.1.501 <br />2 REMOVE CONCRETE CURB AND GUTTER LF $2.00 1,484.00 $2,968.00 1 ,484.00 $2,968.00 <br />2104.501 <br />3 REMOVE BITUMINOUS PAVEMENT SY $2.00 3,607.00 $7,214.00 3,607.00 $7,214.00 <br />2104.503 <br />4 REMOVE DRIVEWAY PAVEMENT (BITUMINOUS) SY $3.00 311.00 $933.00 311.00 $933.00 <br />2104.503 <br />5 REMOVE DRIVEWAY PAVEMENT (CONCRETE) SY $4.00 17.00 $68.00 17.00 $88.00 <br />2104.505 <br />6 REMOVE AND REiNSTALL BASKETBAUL HOOP EA $200.00 2.00 $400.00 2.00 $400.00 <br /> AND POST <br />2104.509 <br />7 SAWCUT CONCRETE PAVEMENT (FULL DEPTH) LF $10.00 15.00 $150.00 16.30 $163.00 <br />2104.511 <br />8 SAWCUT BITUMiNOUS PAVEMENT (FULL LF $4.00 391.00 $1 ,584.00 337.70 $1,350.60 <br /> DEPTH) <br />2104.513 <br />9 SALVAGE SiGNS AND POSTS EA $50.00 2.00 $100.00 0.00 $0.00 <br />2104.523 <br />10 SALVAGE MAIlBOX EA $50.00 16.00 $800.00 16.00 $800.00 <br />2104.523 <br />. COMMON EXCAVATION (P) CY $8.40 2,170.00 $13,888.00 2,170.00 $13,888.00 <br /> 05.501 <br />12 SUBGRADEEXCAVATION CY $7.50 100.00 $750.00 0.00 $0.00 <br />2105.507 <br />13 SELECT GRANULAR BORROW (CV) CY $10.00 1,310.00 $13,100.00 1,310.00 $13,100.00 <br />2105.522 <br />14 LANDSCAPE RESTORATON LS $100.00 1.00 $100.00 1.00 $100.00 <br />2105.601 <br />15 STREET SWEEPER (WITH PICKUP BROOM) HR $100.00 5.00 $500.00 1.50 $150.00 <br />2123.601 <br />16 AGGREGATE CLASS V 100% CRUSHED TON $15.00 50.00 $750.00 0.00 $0.00 <br /> L1MEROCK <br />2211.501 <br />17 AGGREGATE BASE CLASS V, l00%CRUSHED CY $23.00 909.00 $20,907.00 1,178.00 $27,094.00 <br /> L1MEROCK (CV) <br />2211.502 <br />18 CONCRETE DAIVEWAY APRON SY $40.70 170.00 $6,919.00 132.80 $6,404.96 <br />2301.503 <br />19 TYPE 41 BITUMINOUS MIXTURE DRIVEWAY SY $19.00 131.00 $2,489.00 277.50 $5,272.50 <br /> PAVEMENT <br />2321.511 <br />20 TYPE L VNW35035C BASE COURSE MIXTURE TON $45.00 422.00 $18,990.00 426.07 $19,173.15 <br />2350.609 <br />21 TYPE L VWE35035C WEARiNG COURSE TON $48.00 422.00 $20,256.00 368.22 $17,674.56 <br /> MIXTURE <br />2350.609 <br />. BITUMINOUS MATERIAL FOR TACK COAT GAL $2.00 183.00 $366.00 183.00 $366.00 <br /> 7.502 <br /> 3 REINSTAUl EXISTING MAILBOXES EA $50.00 16.00 $800.00 16.00 $800.00 <br />2412.602 <br />24 CONCRETE CURB AND GUTTER DESiGN 5518 LF $10.25 1,490.00 $15,272.50 1,484.00 $15,211.00 <br />2531.501 <br /> Page 3 of 5 <br /> ------- <br />