My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-08-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 09-08-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:37 PM
Creation date
11/14/2006 2:37:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />~ <br />~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />September 3, 2003 <br /> <br />Agenda Item 7.A. <br /> <br />FROM: <br /> <br />Mayor Beverly Aplikowski <br />Conncil Member David Grant <br />Council Member Brenda Holden <br />Council Member Gregg Larson <br />Council Member Lois Rem <br /> <br />Aaron Parrish, Director of Community Services III <br /> <br />TO: <br /> <br />SUBJECT: <br /> <br />Cummings Park Shelter Design <br /> <br />ENCLOSURES: <br /> <br />1. September 3, 2003 Letter from Kraus-Anderson to Guidant <br />2. HCM Original Design <br />3. RSP Currently Approved Design <br /> <br />. Overview <br /> <br />Recently, the Council approved the desigu of the Cummings Park Shelter. As Council will <br />recall, as part of the development agreement between Guidant and the City, Guidant is required <br />to construct a shelter in an amount not to exceed $350,000. After finalizing the cost estimates <br />for the shelter as currently designed, the cost is currently estimated at $450,000. Enclosed is a <br />letter from Kraus-Anderson to Guidant providing a breakout of the costs. In a meeting with <br />Kraus-Anderson and Guidant, they indicated that they received bids from other contractors as <br />well all yielding approximately the same cost. There are generally two options to address the <br />cost differential. These options include: <br /> <br />1. Allocating approximately $100,000 from the Park Fund to cover the difference <br />2. Go back to the original park shelter design prepared by HCM thereby reducing the <br />project budget to $350,000. <br /> <br />From staffs perspective, the second option is preferable. While there are only minor changes in <br />the facility as currently approved and the original desigu, the Council will note the following: <br /> <br />. <br /> <br />)> The currently approved building plan calls for an L shaped building while the original <br />plan called for a rectangular building. In our discussions with RSP, we indicated that we <br />wanted a building like the one currently in Tony Schmitt Park. We intended that to <br />primarily pertain primarily to building materials. They took the currently approved <br />design one step further by replicating the layout of the Tony Schmitt building. <br />)> The currently approved building plan has a roof over the entire picnic area while the <br />original plan only partially covers the picnic area. The remainder of the picnic area is an <br />open air courtyard enclosed by a half wall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.