Laserfiche WebLink
<br />., <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL WORKSESSION <br />SEPTEMBER 15,2003 <br /> <br />3 <br /> <br />of Arden Hills, Chief Boehlke said the need and hope of the LJVFD to take <br />delivery on a new engine with a 75-foot ladder needed at Station One was for year <br />2009, replacing Engine 762 in 2011 or 2012. Lastly, Chief Boehlke said Station <br />One was built in 1946 and had become a proverbial "money pit", noting a fire <br />station should be located closer to more affordable housing locations in the City. <br /> <br />Chief Boehlke also presented a truck rebuild/replacement plan which illustrated <br />vehicle types, life and rebuild plan. His recommendation was to eliminate truck <br />rebuilds due to the dramatic increases costs based upon the new truck technology <br />and safety features, He noted the long term planning for the LJVFD was for a 30- <br />year period, although not fine-tuned. <br /> <br />Councilmember Larson said although the current [LJVFD] budget may seem a bit <br />ambitious, he has noted significant improvements in the department. <br /> <br />Mayor Aplikowski thanked Chief Boehlke, Deputy Chief Adair and District Chief <br />Jensen and she recommended a public commendation to the LJVFD occur at an <br />October 2003 City Council meeting. <br /> <br />Ramsev County Transportation: <br />Discussion <br /> <br />Lexiol!ton A venne Reconstruction <br /> <br />Mr. Jim Tolaas, Ramsey County, presented a graphic representation of the <br />Lexington Avenue reconstruction from Victoria Avenue to County Road 96, which <br />indicated a 5-lane facility with a continuous left turn lane. He noted Shoreview <br />requested an 8-foot path on the east side of the roadway, He said right turn lanes <br />into Karth Lake East neighborhood are included in the plan. He noted that in the <br />past, those residents of the Karth Lake East neighborhood indicated the desire to <br />have a signal placed at Amble Road. In terms of cost, several features of <br />reconstruction will not be the responsibility of the City. However, the right-of-way <br />acquisition will involve some cost to Arden Hills, He noted Shoreview had <br />requested a continuous median along the roadway. He mentioned Shoreview <br />Mayor Sandy Martin suggested a joint Arden Hills/Shoreview meeting to discuss <br />the project. He noted the project timeline was one year from start to completion <br />occurring before the winter of 2006, <br /> <br />Councilmember Larson asked if the problem for those residents entering and <br />exiting Lexington A venue would be somewhat remedied with the completion of <br />the reconstruction project. <br />