My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-29-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 09-29-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2008 2:15:37 PM
Creation date
11/14/2006 2:37:24 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />=t. "'63- 23 I) <br /> <br />'C~63-Z 4- 2) <br /> <br />. <br />c.03-25 3) <br /> <br />. <br /> <br />tf') <br /> <br />f) <br /> <br />Guidant Corporation <br />Parking Ramp No, I <br />Land Use Application - Description Request <br />August 4, 2003 <br /> <br />Description of Request (supplement) <br /> <br />Guidant is requesting site plan approval for Parking Ramp No. I. The ramp will be located <br />near t\;1e southwest corner ofthe Guidant campus (re(erto Campus Master Plan P.U,D.). It <br />will replace an existing surface parking lot inunediately south of existing Building 'C'. The <br />ramp will be a concrete structure, 4 levels, with the lowest level partially below grade. The <br />height above grade at the northwest stair core will be approximately 34 feet. The northeast <br />stair/eIevator core will be approximately 44 feet above grade. The exterior will incorporate <br />cast-stone, metal panel and glass, The design builds on the precedent established by the <br />previoUsly approved Training Center project, which is now under construction. The west and <br />south elevations of the ramp wi\l inCllrporate a lattice system to allow for the development of <br />a "grow waIL" The "grow walr' will be planted with vines to aid in the screening of vehicles. <br /> <br />Guidant is requesting site plan approval for an addition to Building' N'. Refer to the Campus <br />Ma.<;ter Plan P.U.D. forlocation. The building addition wi\l be a one story, 31,000 square <br />foot, steel structure, matching the existing building height of26 feet. The exterior will <br />incOrporate brick, cast stone, metal panel and glass. The design will be consistent with the <br />Training Center and Building E addition, both of which are under construction. The building <br />wilt house development and assembly of medical device components. The existing portions <br />of the building wi\l be re-c1ad with stucco to follow the design of Building 'F'. <br /> <br />Guidant is requesting an amendment to its Campus Master Plan P,U,D. The purpose of the <br />amend1DeIlt is to allow for an addition to existing Building 'N'. To maintain the balance of <br />building area as described in the Campus Master Plan P,U,D., future construction will be <br />reduced in area, <br /> <br />RECEIVED <br />AUG - 4 Z003 <br /> <br />Page I of I <br /> <br />CITY OF ARDeN HIllS <br />
The URL can be used to link to this page
Your browser does not support the video tag.