My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-14-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 10-14-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:41 PM
Creation date
11/14/2006 2:37:43 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br /> <br />Agenda Item 3.B <br /> <br />MEMORANDUM <br /> <br />1hresher Square <br />700 Third Street South <br />Minneapolis, MN 554] 5 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />Ms. Michelle Wolfe! <br />City of Arden Hills <br /> <br />Copy: <br /> <br />Nick LandwerlURS <br />Tom Moore!AH <br /> <br />File: <br /> <br />37951-026-1001 <br /> <br />From: <br /> <br />Greg Brown r.s:"Q>1 <br />Arden Hills City Engineer vo ~ <br /> <br />Date: <br /> <br />October 8, 2003 <br /> <br />Subject: <br /> <br />Booster Pump Station Authorization for Advertisement for Bids <br /> <br />Backl!round <br />The City Engineer is currently completing final construction plans and specifications for the <br />rehabilitation of the City's booster pump station located next to the south water tower. The <br />pumping station is used to insure that adequate pressure is available in the city's water system to <br />keep areas in the northern part of the City served via the north water tower. The existing pump <br />station was constructed in 1968 and has not received any major rehabilitation work over its 35 <br />year lifetime. This project is in the Water Utility CIP for 2003. <br /> <br />The major components ofthe project include the replacement of two 50 horsepower pumps, <br />replacement of a natural gas auxilliary generator with a diesel generator, new interior lighting <br />and heating and the replacement of a 7 foot double door with a 10 foot garage door for improved <br />access. Replacement of the existing l6'XI6' garage door on the south water tower will be bid as <br />an alternate with the project as it is in very poor condition. The 2003 budget for pump station <br />rehabilitation is $325,000. The current estimated construction cost for the improvement is <br />$255,000 (including the water tower door). Total project cost including engineering and <br />administration is estimated at $306,000 which is $19,000 under the budget provided in the CIP. <br />The project will be funded entirely by the City Water Utility Fund. <br /> <br />Recommendation <br />The City Engineer recommends that Council authorize the advertisement for construction bids <br />for the Booster Pump Station Rehabilitation Project. <br /> <br />PROJECTS\ARDENHIL\37951\GENERAL\Documents\Agenda Memo 10~14~03ltem 3Bdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.