My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-20-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 10-20-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:41 PM
Creation date
11/14/2006 2:38:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />C. <br /> <br />. <br /> <br />. <br /> <br />Preparation of Land Use and Infrastructure Plan. <br /> <br />1. Developer Oblil!:ations. Developer shall accomplish the following <br />tasks: <br /> <br />a. Collect and analyze site data including: <br /> <br />(1) TCAAP Site information sources to identify existing <br />conditions. <br /> <br />(2) Building inspection and infrastructure systems <br />surveys, including location, verification, inventory, <br />and TCAAP Site condition evaluations. <br /> <br />(3) Research and field investigation results to identify <br />system conditions, capacities and constraining <br />elements of infrastructure as well as possihle <br />opportunities for expanded service. <br /> <br />b. <br /> <br />Review and Comment. Review and comment on drafts of <br />the City's Comprehensive Plan AII1endment and <br />Infrastructure Plans as well as the City's economic impact <br />study relative to possible infrastructure financing. <br /> <br />2. Citv Oblil!:ations. The City shall accomplish the following tasks: <br /> <br />a. Planninl!: Consultant. City shall prepare an RFQ and retain a <br />planning consultant who shall prepare a Comprehensive Plan <br />Amendment and Infrastructure Plan for the TCAAP Site to <br />include the following elements: <br /> <br />(1) Official Controls, Design Guidelines, and related <br />regulatory changes to ensure implementation of the <br />Comprehensive Plan Amendment. <br /> <br />(2) Transportation analysis and study. <br /> <br />(3) Preliminary layout of infrastructure (street, sewer, <br />water, and storm water). <br /> <br />b. <br /> <br />Financial Consultant. Retain financial consultant to provide <br />an economic impact study for the construction and payment <br />of public infrastructure improvements for the AH Reuse Area. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.