Laserfiche WebLink
<br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />Ie <br />I <br />I <br /> <br />City of Arden Hills <br />2004 PMP <br /> <br />Edgewater Avenue - Roadway Quantities <br /> <br />Full Reconstruct, 900 FT <br /> <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBILIZATION LS 1.0 $5,061.85 $5,062 <br />2 CLEARING AC 8 $750.00 $6,000 <br />3 GRUBBING AC 8 $750.00 $6,000 <br />4 REMOVE LANDSCAPING LS 1.0 $2,500.00 $2,500 <br />5 SAWCUT BITUMINOUS PAVEMENT(FULL DEPTH) LF 140 $4.00 $560 <br />6 SAWCUT CONCRETE PAVEMENT LF 100 $6.00 $600 <br />7 REMOVE BITUMINOUS PAVEMENT SY 2,104 $2.00 $4,209 <br />8 REMOVE BIT DRIVEWAY SY 106 $3.00 $317 <br />9 REMOVE CONC DRIVEWAY SY 57 $3.00 $170 <br />10 REMOVE GRAVEL DRIVEWAY SY 32 $1.50 $48 <br />11 REMOVE AND REPLACE MAILBOX EA 11 $50.00 $550 <br />12 COMMON EXCAVATION CY 1,846 $7.00 $12,922 <br />13 SELECT GRANULAR BORROW CY 923 $13.50 $12,461 <br />14 AGGREGATE BASE CLASS 5 CY 580 $21.00 $12,180 <br />15 2' TYPE LV3 WEARING COURSE TON 251 $38.00 $9,538 <br />16 2' TYPE LV3 NON.WEARING COURSE TON 251 $35.00 $8,785 <br />17 4' PERF. DRAIN PIPE LF 400 $5.00 $2,000 <br />18 BIT DRIVEWAY SY 70 $25.00 $1,750 <br />19 CONC DRIVEWAY SY 57 $40.00 $2,280 <br />20 GRAVEL DRIVEWAY SY 29 $15.00 $435 <br />21 TACK COAT GAL 109 $2.25 $245 <br />22 CURB AND GUTTER LF 1,460 $9.50 $13,870 <br />23 SILT FENCE LF 1,500 $2.00 $3,000 <br />24 REMOVE SILT FENCE LF 1,500 $0.50 $750 <br />25 SOD WITH 4" TOPSOIL AND FERTILIZER SY 1,984 $3.00 $5,892 <br />26 SEED WITH 4" TOPSOIL AND FERTILIZER SY 300 $1.25 $375 <br />27 TEMPORARY ROCK ENTRANCE EA 1 $2,000.00 $2,000 <br />28 STREET CLEANING HR 10 $100.00 $1,000 <br />29 WATER FOR DUST CONTROL MGAL 100 $18.00 $1,800 <br />30 TRAFFIC CONTROL LS 0.5 $7,000.00 $3,500 <br />31 MODULAR BLOCK RETAINING WALL SY 1,350 $25.00 $33,750 <br /> ESTIMATED CONSTRUCTION COST $154,549 <br /> 10% CONTINGENCY $15,500 <br /> 26% ENGINEERING AND ADMINISTRATION $40,200 <br /> TOTAL COST $210,000 <br />