My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-10-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 11-10-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:44 PM
Creation date
11/14/2006 2:38:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br /> <br />City of Arden Hills <br />2004 PMP <br /> <br />URS PROJECT NO. 37951027-0101 <br /> <br />WATERMAIN <br /> <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBILIZATION LS 1 $1,335.00 $1,335 <br />2 LOWER 8" WATER MAIN LF 60 $30.00 $1,800 <br />3 6" WATER MAIN LF 120 $25.00 $3,000 <br />4 REMOVE AND REPLACE HYDRANT & GV EA 3 $2,500.00 $7,500 <br />5 REMOVE AND REPLACE GATE VALVE EA 6 $2,000.00 $12,000 <br />6 HYDRANT EA 1 $1,800.00 $1,800 <br />7 1" SERVICE TAP EA 1 $200.00 $200 <br />8 1" WATER SERVICE PIPE LF 20 $20.00 $400 <br />9 3" RIGID INSULATION SY $35.00 $0 <br />10 TRENCH STABILIZATION MATERiAl TON $15.50 $0 <br /> ESTIMATED CONSTRUCTION COST $28,035 <br /> 10% CONTINGENCY $2,800 <br /> 26% CONTINGENCY $7,300 <br /> TOTAL COST $38,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.