My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-08-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 12-08-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:51 PM
Creation date
11/14/2006 2:38:36 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />CONSULTING ENGINEERS <br /> <br />PHONE 763-571-2500 <br />FAX 763-571-1168 <br /> <br /> <br />UL TEIG ENGINEERS, INC. <br /> <br />5201 EAST RIVER ROAD, SUITE 308 <br /> <br />MINNEAPOLIS. MN 55421 <br /> <br />October 20, 2003 <br /> <br />I hereby certifY that this plan, <br />specification, or report was prepared by <br />me or under my direct supervision and <br />that I am a duly licensed professional <br />engineer under the laws of the State of <br />Minnesota <br /> <br />Ml'. Jim Johnson <br />Bechtel Telecomunications <br />2850 Metro Drive <br />Suite 250 <br />Bloomington, MN 55425 <br /> <br />g. No. 1.It16 J f <br /> <br /> <br />Project Name: <br /> <br />Arden Hills WT (MI-OOl A) <br />Arden Hills, MN <br />03-5634 <br />Structural Analysis <br /> <br />VEl Project Num.: <br />Subject: <br /> <br />Ulteig Engineers Inc. (lIE1) has completed the structural evaluation for the above site. The structure is <br />adequate for the installation for the proposed antenna system loading (As per the antenna information <br />provided on October 10, 2003, see table on this page). The antenna system includes antennas, coaxial <br />cables, and associated hardware <br /> <br />Proposed Antenna Information: <br /> <br />! Antenna and Mounting Mounting Coaxial Cable <br />Height <br />I (I) Celwave PDt 0 177 panel <br />antennas on existing 130' (+/-) (1) 1 5/8" Cables Proposed <br />I watertower handrail - <br /> <br />It was assumed that the proposed coaxial cables will be routed up the interior ofthe watertank. <br /> <br />If additional antennas are to be added to this tower, Ulteig Engineers recommends that the tower be <br />structurally re-assessed. Thank you for allowing us to assist you on this project. IfUEI can be of any other <br />assistance on this or any other projects please let us know. <br /> <br />SincereI~ <br /> <br /> <br /> <br />Daniel Sargeant, PE <br />Uheig Engineers, Inc. <br /> <br /> <br />EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.