|
<br />Application for Payment: Itemization
<br />.hedule: A - lill Station #2 and #5 Reconstruction
<br /> Unit Contract Contract To-Date To-Date
<br />No. Item Unit Price Quantity Amount Quantity Amount
<br /> Mobilization LS $10.000.00 1.00 $10,000.00 1.00 $10.000.00
<br />2021.501
<br />2 Lift Station No.2 Removal LS $17,500.00 1.00 $17.500.00 1.00 $17,500.00
<br />2103.601
<br />3 Lift Station No.5 Removal LS $17,500.00 1.00 $17,500.00 1.00 $17,500.00
<br />2103.601
<br />4 Remove Sewer Pipe (10" elP) LS $20.00 10.00 $200.00 0.00 $0.00
<br />2104.501
<br />5 Remove Bituminous Driveway Pavement SY $2.50 600.00 $1,500.00 294.00 $735.00
<br />2104.601
<br />6 Sawing Bituminous Pavement (Full Depth) LF $4.00 60.00 $240.00 55.00 $220.00
<br />2104.513
<br />7 Bituminous Driveway Pavement (3') SY $18.20 600.00 $10,920.00 421.00 $7,662.20
<br />2350.521
<br />8 Lift Station Slructural Concrete Uft Station #2 LS $18,500.00 1.00 $18,500.00 1.00 $18,500.00
<br />2411.603
<br />9 Lift Station Structural Concrele Lift Slation #5 LS $18,500.00 1.00 $18,500.00 1.00 $18,500.00
<br />2411.603
<br />10 Sewer Bypass lift Station #2 LS $5,000.00 1.00 $5,000.00 1.00 $5,000.00
<br />2503.603
<br />11 Dewatering LS $5,000.00 1.00 $5,000.00 1.00 $5,000.00
<br />2451.601
<br />_ Sewer Bypass Uft Station #5 LS $5,000.00 1.00 $5,000.00 1.00 $5,000.00
<br /> 03.603
<br />13 Fittings LB $3.00 3,000.00 $9,000.00 3,000.00 $9,000.00
<br />2503.603
<br />14 6" elP Forcemain LF $92.00 30.00 $2,760.00 0.00 $0.00
<br />2503.603
<br />15 to' elP Forecemain LF $112.00 30.00 $3,360.00 0.00 $0.00
<br />2503.603
<br />16 6" Fla"9' Gate Valve EA $425.00 4.00 $1,700.00 4.00 $1,700.00
<br />2503.603
<br />17 8" Flange Gale Valve EA $725.00 2.00 $1,450.00 1.00 $725.00
<br />2503.603
<br />18 10' Flange Gale Valve EA $1,230.00 2.00 $2,460.00 0.00 $0.00
<br />2503.603
<br />19 6' Swing Flex Check Valve EA $800.00 4.00 $3,200.00 4.00 $3,200.00
<br />2503.603
<br />20 3' Sleel Vent Pipe EA $200.00 4.00 $800.00 4.00 $800.00
<br />2503,603
<br />21 12' Bend EA $450.00 1.00 $450.00 1.00 $450.00
<br />2503.603
<br />22 14" Bend EA $1,000.00 1.00 $1,000.00 1.00 $1,000.00
<br />2503.503
<br />23 Connecllo Existing Sanitary Force Main EA $2,000.00 2.00 $4,000.00 2.00 $4,000.00
<br />2503_603
<br />24 Uft Station No.2 Pump System LS $29,111.00 1.00 $29,111.00 1.00 $29,111.00
<br />2503.603
<br />. Uft Station No.5 Pump System LS $28,591.00 1.00 $28,591.00 1.00 $28,591.00
<br /> 03.603
<br />26 un Station No.2 Electrical System wlDouble LS $30,800.00 1.00 $30,800.00 1.00 $30,800.00
<br /> Enclosure
<br />2503.603
<br /> Page 3 of 5
<br />
|