Laserfiche WebLink
<br />, <br />Application for Payment: Itemization <br />Schedule: A- <br />.0. Unit Contract Contract T o.Date To-Date <br />Item Unit Price Quantity Amount Quantity Amount <br /> MOBILIZATION lS $2,000.00 1.00 $2.000.00 100 $2,000.00 <br />2 MODULAR BLOCK RETAINING WALL WITH SF $21.50 400.00 $8.600.00 504.00 $10,836.00 <br /> ORAINAGE <br />3 FENCE RAILING (CHAIN LINK) IF $13.75 120.00 $1.650.00 120.00 $1.650.00 <br />4 3' BITUMINOUS PAVING SF $4.25 1.250.00 $5,312.50 1,250.00 $5.312.50 <br />5 CLASS 5 AGGREGATE BASE TON $4.00 375.00 $1,500.00 375.00 $1,500.00 <br />6 4' CONCRETE PAVING WITH 6' AGGREGATE SY $60.00 25.00 $1,500.00 25.00 $1.500.00 <br /> BASE <br />7 SITE GRADING (INCL. TOPSOil AND $00) SY $4.10 2.100.00 $8,610.00 1.000.00 $4.100.00 <br />8 BERM REMOVAL CY $2.50 1,300.00 $3.250.00 1,300.00 $3.250.00 <br />9 8' HOPE (DIRECTIONAL BORING) IF $18.00 350.00 $6,300.00 300.00 $5.400.00 <br />10 DRAINAGE STRUCTURE TYPE H WITH R4370 EA $1.550.00 1.00 $1.550.00 1.00 $1.550.00 <br /> TYPE D CASTING <br />11 WOOD FIBER BLANKET SY $2.75 555.00 $1,526.25 0.00 $0.00 <br />. SIL HENCE LF $4.50 200.00 $900.00 0.00 $0.00 <br /> Subtotal: $42.698.75 $37,098.50 <br /> Grand Total: $42,698.75 $37,098.50 <br /> <br />. <br /> <br />Page 3 of 4 <br />