Laserfiche WebLink
<br />Schedule: B - KARTH LAKE PUMP STATtON <br /> Unit Contract Contract T o.Date To-Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br />1 MOBILIZATION LS $3.925.00 1.00 $3.925.00 0.50 $1.962.5~. <br />2021.501 <br />2 BITUMINOUS PAVEMENT (PATH PATCHING) SY $24.75 150.00 $3,712.50 0.00 $0.00 <br />2350.604 <br />3 4' HDPE PIPE SEWER LF $25.00 20.00 $500.00 0.00 $0.00 <br />2503.502 <br />4 4' HDPE BEND EA $25.00 1.00 $25.00 0.00 $0.00 <br />2503.502 <br />5 6',,' REDUCER EA $35.00 1.00 $35.00 0.00 $0.00 <br />2503.502 <br />6 F & I ELECTRICAL CONTROL SYSTEM LS $23,100.00 1.00 $23.100.00 0.80 $18,480.00 <br />2503.502 <br />7 FURNISH SUBMERSIBLE PUMP LS $14.500.00 1.00 $14.500.00 0.00 $0.00 <br />2503.502 <br />B 6' HDPE FORCEMAIN LF $17.60 1,520.00 $26,752.00 1,520.00 $26,752.00 <br />2503.502 <br />9 CONNECT TO EXISTING STORM SEWER STUB EA $1,800.00 1.00 $1.BOO.00 1.00 $1.800.00 <br />2503.503 <br />10 DRAINAGE STRUCTURE SPECIAL, 27' EA $750.00 1.00 $750.00 0.75 $562.50 <br /> (HANDHOLE) <br />2503.602 <br />11 RAFT ASSEMBLY (FOR SUBMERSIBLE PUMP) EA $3,000.00 1.00 $3,000.00 0.00 $0.00 <br />2503.602 <br />12 SILT FENCE TYPE HEAVY DUTY LF $3.00 1,000.00 $3,000.00 0.00 $0.00 <br />2572.502 <br />13 SODDING TYPE LAWN SY $4.00 3,000.00 $12,000.00 0.00 $0.00 <br />2575.505 $o.oe <br />14 WOOD FIBER 8LANKETS TYPE REGULAR SY $3.00 200.00 $600.00 0.00 <br />2575.523 <br />15 RESTORATION LS $5,000.00 1.00 $5,000.00 0.00 $0.00 <br />2575.602 <br /> Subtotal: $98,699.50 $49,557.00 <br /> Grand Total: $232,772.50 $51,852.00 <br /> <br />. <br /> <br />Page 4 of 5 <br />