My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-08-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 03-08-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:25 PM
Creation date
11/14/2006 3:34:04 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'\ <br /> <br />URS <br /> <br />Agenda Item 7.B <br /> <br />. <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 554] 5 <br />Phone: (6]2) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />Michelle Wolfe <br />City Administrator <br /> <br />Copy: <br /> <br />Aaron Parrish/Arden File: 37951-005-7001 <br />Hills <br />Tom Moore/Arden <br />Hills <br />Greg Brown/URS <br /> <br />From: Nick Landwer, PE <br /> <br />Date: March 3, 2004 <br /> <br />Subject: Authorize Specifications for Street Sign Replacement <br /> <br />The 2004 CIP has included $50,000 for the replacement of every street corner sign in the City of . <br />Arden Hills. With input from the Council and Staff the Engineer has developed specifications <br />based on the following requirements: <br /> <br />. Single Faced/Double Panel Sign <br />. High Visibility 9-inch tall Sign with Rounded Corners <br />. White Outline Trim <br />. White Title Case Letters (Upper and Lower Case) on Green Background <br />· Arden Hills logo (tree only) on City Streets <br />. Square pole (14 GA. Galvanized Steel) <br />. Minimum Mounting Height of8-feet from Ground <br /> <br />Proposed schedule should Council approve this project: <br />Advertisement for Bids March 19, 2004 <br />Bid Opening April 13, 2004 <br />Award Contract April 26, 2004 <br />Installation/Replacement June-August 2004 <br /> <br />The total estimated cost for this project is $70,000 including design, installation and <br />construction administration costs. The City Engineer requests that the Council approve the <br />specifications for replacement of all City street signs and order Advertisement for Bids for this <br />project. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.