My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-29-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 03-29-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:28 PM
Creation date
11/14/2006 3:34:25 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />) <br /> <br />) <br /> <br />URS <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-])78 <br /> <br />e <br /> <br />To: <br /> <br />Peter Hellegers, <br />Arden Hill City Planner <br /> <br />Copy: Greg Brown, URS File: <br /> <br />37951-005-2001 <br /> <br />From: Nick Landwer, PE <br /> <br />Date: February 13, 2004 <br /> <br />Subject: Bethel College - New Dormitory Special Use Permit Master Plan Amendment <br />Proposal, Plan Review <br /> <br />I have reviewed the utility, grading and drainage plans for the proposed Bethel College New <br />Residence Hall development. My comments inelude the following: <br /> <br />1_ The site plan is somewhat confusing. It only shows existing contours and benchmark <br />information. Is it supposed to be an existing conditions plan or a site survey plan? Please <br />verify and correcL <br /> <br />. <br /> <br />2. On the Utility Site Plan: <br />A. The proposed watermain connection is not looped. Please provide water supply <br />calculations indicating that the fire flow is sufficienL The fire protection plan must be <br />reviewed by the Fire Inspector. <br />S- A conflict exists between the tablc and note regarding the size of the watermain <br />segment W18. <br />e. The plans call for insulation of a segment of proposed sanitary sewer. It appears that <br />it may be possible to place additional fill over this area to satisfy the minimum cover <br />requirements? Please verify. <br />D. The Bethel College sanitary sewer flows to a lift station. In order to verify the <br />capacity of the lift station, please provide sanitary sewer flow calculations for the <br />proposed dormitory. <br /> <br />3. On thc Grading, Drainage and Erosion Control Plan: <br />A. A portion of the wetland located cast of the dormitory will be filled by the proposed <br />construction_ Also, depending on the sensitivity of the adjacent wetlands, additional <br />erosion and sediment control measures may be requircd. Please coordinate wetland <br />protection and mitigation requirements with the Rice Creek Watcrshed District. <br />NPDES (Phase 2) and RCWD permits will be required. <br />B. Culvert D7, located between the wetlands, has the same invert elevations on both <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.