Laserfiche WebLink
<br />.J <br /> <br />URS <br /> <br />Agenda Item 2.C <br />MEMORANDUM <br /> <br />. <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (6]2) 370-0700 <br />Fax: (612)370-13783 <br /> <br />To: <br /> <br />Miehelle <br />Wolfe/Arden Hills <br /> <br />Copy: <br /> <br />Tom Moore/Arden Hills <br />Jim Perron/Arden Hills <br />Nick LandwerfURS <br /> <br />File: <br /> <br />37951 005 <br /> <br />From: Greg Brown, PE 16 ~\ ~ <br />Arden Hills City Engineer <br /> <br />Date: Apri114,2004 <br /> <br />Subject: Summary of Five Year CIP Scope <br /> <br />Introduetion <br />We have prepared a preliminary scope for the next five years of the City of Arden Hills Capital <br />Improvements Program (CIP) for improvements associated with pavement management, trails <br />watennain, sanitary sewer and storm water/drainage systems, The eapital improvements <br />identified were developed through meetings and discussions with Jim Perron, Tom Moore, Niek <br />Landwer and myself to prioritize the needs ofthe City in the upcoming five years, Funding for <br />the improvements will be made from the respective utility funds except for the pavement <br />improvements, Funding for pavement improvements program will be made through <br />assessments, State Aid funds and City funding sourees, This mcmorandum is intended to outline <br />the philosophy behind the Capital Improvements Program, assist with the discussion of the 2005 <br />-2009 CIP and solicit council and staff comments on the proposed CIP scope. A quick reference <br />summary and cost/funding spreadsheet are attaehed as well for Council's information, <br /> <br />. <br /> <br />A. Pavement Management Program <br />The City is in the third year of its eurrent neighborhood based Pavement Management Program. <br />URS completed the Pavement Condition Index (PCI) ratings for all streets within the City in <br />1999 and 2002 and is scheduled to resurvey the City in 2005. The PCI ratings along with <br />drainage infrastructure condition, curb and gutter eondition, street width, water quality and <br />utility eondition are used as factors in prioritizing the expenditure of funds for street and utility <br />maintenance and reconstruction projects. <br /> <br />The annualized budget for pavement and drainage improvements should be determined by <br />considering the city infrastructure as a whole and eomparing the replacement life cyeles of <br />pavements and other infrastructure with the current and anticipated availability of funds. The . <br />following is a macro analysis of the current pavement infrastructure needs for the entire city for <br />the purposes of determining what the annual PMP funding allocation should be, For the <br />purposes of this analysis, we have made the following assumptions: <br /> <br />C:\Documents and Settings\PangS\LocaJ Settings\Tempornry Internet Files\OLK27\5YearCLP Memo - 4-14-2004.doc <br />