My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-19-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 04-19-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:30 PM
Creation date
11/14/2006 3:34:43 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Ill. Water Utility Improvements <br />2003 <br />. Inspect South Water Tower- <br />. Upgrade Booster Station - In Progress <br />2004 <br />. Emergency Connection to Shoreview (at Victoria) - half completed in 2003 <br />with Cummings Park Drive, remainder to he completed in 2005 with Ramsey <br />County Improvements <br />. Emergency Connection to Shoreview (at Victoria) - half completed in <br />2003 with Cummings Park Drive, remainder to be eompleted in 2005 with <br />Ramsey County Improvements <br />. Valve and hydrant replacement with Edgewater PMP <br />2005 <br />. Upgrade 8" watermain to 12" along West Round Lake Road - To be done in <br />conjunction with West Round Lake Road reconstruction ($300,000) <br />. Repaint South Water Tower <br />. estimated cost of$365,000 <br />. Valve and Hydrant replacement in conjunction with PMP <br />. estimated cost $50,000 <br />. Emergency Conneetion to Shoreview with Ramsey County Improvements <br />. estimated Cost: $11 0,000 <br />. Upgrade 8" watermain to 12" along West Round Lake Road- To be done <br />in eonjunction with West Round Lake Road reconstruetion <br />. estimated cost: $150,000 <br />. Repaint South Water Tower <br />. estimated eost of $500,000 <br />. Valve and Hydrant replaeement in conjunction with PMP <br />. estimated cost $50,000 <br /> <br />. <br /> <br />2006 - 2009 <br />. Valve and Hydrant replacement in conjunction with PMP work <br />. Estimated cost of $5 0,000 per year <br />. Valve and Hydrant replacement in conjunetion with PMP work <br />. Estimated cost of $50,000 per year <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.