My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-10-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 05-10-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:31 PM
Creation date
11/14/2006 3:34:51 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />" <br /> <br />URS <br />BRW, Inc. <br /> <br />Agenda Item 3.D <br /> <br />URS <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370.1378 <br /> <br />. <br /> <br />To: <br /> <br />Murtuza Siddiqui/Arden Hills <br /> <br />File: 37951-026-0101 <br /> <br />From: Gregory S, Brown <br />Arden Hills City Engineer <br /> <br />Date: May 5, 2004 <br /> <br />Subject: Pay Estimate #3 <br />Booster Station Rehabilitation Project <br /> <br />Background <br />The City of Arden Hills awarded EnComm Midwest, Inc. of Isanti, MN the Booster Station <br />Rehabilitation Project on November 24, 2003 for a total contract amount of $175,420.00, Pay . <br />Estimate #1 and #2 in the amount of $13,585.00 have been approved by the Council. <br /> <br />This project is being paid through the City's Water Utility Fund. <br /> <br />Project Status <br />Booster Station Rehabilitation <br />Majority of the work on Booster Station over the last period was on electrical aspects of <br />the rehabilitation including the electrical panel, the generator, and the transformer, which <br />Xcel has installed. The Electrician has also installed conduit and wire for all other items <br />including lights, heater, roll doors, air intake and exhaust fan, the electrical panel, and the <br />generator. <br /> <br />Both pumps and motors along with all necessary valves and fittings have been delivered <br />to the site and one pump set-up is totally complete. Other key elements completed are the <br />wood fence for the generator and 6" concrete slabs for one entry. <br /> <br />The next few weeks the Contractor is scheduled to complete all work involved with this <br />project and return the operation of the Booster Station back to the City. <br /> <br />Recommendations <br />The Arden Hills City Engineer recommends the Council approve Pay Estimate #3 for EnComm <br />Midwest Inc, of Isanti, MN in the amount of $104,090,55. A retain age of 5.00% is being held . <br />for this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.