Laserfiche WebLink
<br />City of Arden Hills <br />2004 Assessment Policy <br /> <br />. <br /> <br />the Arden Hills Pavcment Managemcnt Program (PMP) (as found in the <br />Appendix) <br /> <br />10. Maintenance/Rebabilitation Proiects <br />a. Cold in Place Recycling and Repaving (CIRJRepaving) <br />Recycling of existing deteriorated pavements by pulverizing, mixing <br />with new asphaltic oils and compacting in place. New paving <br />materials arc then placed over the cold recycled pavement similar to a <br />standard overlay. <br /> <br />b. Bituminous Overlay <br />Placement of an additional bituminous layer, generally one inch (1 ") to <br />two inches (2") thick, over an existing bituminous surfaced street. <br /> <br />c. Concrete Pavement Restorati <br />Replacement of existing c <br />mudjacking panels to impr <br />cracks with a petroleum <br />base below the surface. <br /> <br />e. <br /> <br /> <br />etc panels that have deteriorated, <br />bility, and the filling of joints and <br />ed mat I to eliminate tlow water to the <br /> <br />d. Crack Sealing <br />Placement of petr <br />surfaced street for t <br />the surface t <br /> <br />material in the cracks of a bituminous <br />rpose of eliminating the flow of water from <br />te base material blow. <br /> <br />. <br /> <br />I Coating <br />leum based material and aggregate on an existing <br />aced street for the purpose of filling cracks and <br /> <br />f. Bituminous Surfacing Patching <br />Repair or replacement of existing bituminous surfacing that has <br />deteriorated. <br /> <br />\\Earth\Finance\FinanceDirector\APTF\2004Assessment Policy: Revised 4/26/04 <br /> <br />. <br /> <br />2004 Assessment Policy Manual - Page 22 <br />