My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-24-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 05-24-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:34 PM
Creation date
11/14/2006 3:34:56 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />2005 Assessment Policy <br /> <br />. <br /> <br />Lateral benefil may be provided by connection to trunk, sublrunk or lateral <br />pipes. The calculation of la1eral benefit from a trunk or subtrunk pipe will <br />be based on the cost of an eight inch (8") pipe along Ihe same alignmenl <br />for commercial or industrial zoned property and a six inch (6") pipe for all <br />other areas. <br /> <br />8. Infrastructure Rehabilitation Proiects <br />Any project or portion of a project that reconstructs an eXlstmg water <br />system facility. A rehabilitation project may occur on the existing <br />alignment of the water line or on a new alignmenl, Ihus allowing the <br />existing line 10 be abandoned or its status downgraded (i.e., trunk or <br />subtrunk to lateral), <br /> <br />B. Determining Water Main Assessment Rates <br /> <br />], Trunk, Subtrunk, Storage and Treatment FaciIitv Rates <br />Any laleral and building service assessments described below will be <br />deducled from the 10tal improvemenl cost to be assessed. The remaining <br />costs shall be spread equally 10 all properties thai lie within the approved <br />Service District. The costs shall be spread on a gross area basis and will <br />be known as all or any of the following as appropriate: trunk, sublrunk, <br />source, storage, and treatment assessment. . <br /> <br />2. Water Main Lateral Rates <br />The building service assessmenls described below will be deducled from <br />the tolal improvement cost to be assessed. The amount remaining after <br />said deductions will be assessed by the following melhod. <br /> <br />. R-l and R-2 residential lots at 100% ofthe total project cost <br />. All other land uses at 100% of the total proiect cost <br /> <br />3. Water Main Building Service <br />The assessment Tale for each size of building service three-quarter inch <br />(3/4") 10 eight inch (8") inch shall be determined by adding all the cosls <br />associated with each size of service and dividing by the total number of <br />services conslrucled. Each unit will be assessed at the delermined rate for <br />each size and number of services inslalled. This will be known as the <br />building service assessment. <br /> <br />. <br /> <br />2005 Assessment Policy Manual - Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.