Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />City of Arden Hills <br />2005 Assessment Policy <br /> <br />the Arden Hills Pavement Management Program (PMP) (as found in the <br />Appendix) <br /> <br />10, <br /> <br />Maintenance/Rehabilitation Projects <br />a. Cold in Place Recycling and Repaving (CIR/Repaving) <br />Recycling of exisling delerioraled pavements by pulverizing, mixing <br />wilh new asphaltic oils and compacting in place. New paving <br />materials are then placed over the cold recycled pavement similar to a <br />standard overlay. <br /> <br />b. Bituminous Overlay <br />Placement of an additional bituminous layer, generally one inch (1 ") to <br />two inches (2 ") thick, over an exisling bituminous surfaced street. <br /> <br />c. Concrete Pavement Restoration <br />Replacement of existing concrete panels thai have deterioraled, <br />mudjacking panels to improve rideability, and the filling of joints and <br />cracks wilh a petroleum based material to eliminale flow waler 10 the <br />base below Ihe surface. <br /> <br />d. Crack Sealing <br />Placement of pelroleum based malerial in the cracks of a biluminous <br />surfaced street for the purpose of eliminating the flow of waler from <br />the surface to Ihe aggregale base malerial blow. <br /> <br />e. Bituminous Seal Coating <br />Placement of petroleum based malerial and aggregate on an exisling <br />bituminous surfaced street for the purpose of filling cracks and <br />covering mild wear. <br /> <br />f. Bituminous Surfacing Patching <br />Repair or replacemenl of existing biluminous surfacing Ihal has <br />deterioraled. <br /> <br />\\Earth\Finance\FinanceDircctor\APTF\2004Assessment Policy: Revised 5/19/04 <br /> <br />2005 Assessment Policy Manual - Page 23 <br />