Laserfiche WebLink
<br />. ARDEN HILLS PLANNING COMMISSION -MAY 5, 2004 <br /> <br />3 <br /> <br />. <br /> <br />Mr. Hellegers stated applicant was requesting approval of an amendment to their Special <br />Use Permit (SUP) Master Plan and a Site Plan review to allow for the installation of a <br />temporary modular classroom building on the east-central portion of the campus, directly <br />north of the Robertson Center. He indicated the applicant was proposing to install five <br />modular units, which would create one building to serve as classroom space on the <br />campus until the Studcnt Life Center Building had been constructed, The temporary <br />modular classroom building would contain a central corridor and four 50-seat classrooms. <br />The plans provided by the applicant show the building was not connected to the <br />Robertson Center and that the west end of the building would have stairs and ramps and <br />the east end would have stairs to access the building. Trees would need to be removed <br />and retaining walls would need to be constructed to the east and west of the building. <br />The applicant has indicated tlle site would be planted with new landscaping after the <br />temporary building was removed after the Student Life Center was constructed, There <br />was not a set construction schedule for the Student Life Center, but applicant had stated it <br />may take up to seven (7) years before the new building was ready. This was assuming <br />that the funding for the building could be raised in five (5) years and construction would <br />take no more than two (2) years. Staff recommended approval of the Special Use Permit <br />(sixth) AmendmentlMaster Plan and approval of the Site Plan subject to the following <br />conditions: <br /> <br />. <br /> <br />I. The applicant shall continue to abide by the conditions of approval as stated in the <br />approved Special Use Permit (SUP) Master Plan and the subsequent SUP <br />Amendments, <br />2, Building Permit Plans shall be submitted to the Building Official a minimum of two <br />(2) weeks before the planned start of construction. <br />3. No construction shall being before plans are approved by the City of Arden Hills' <br />Building Official. <br />4. The temporary modular classroom building shall be located a minimum of six (6) feet <br />from any existing buildings, <br />5, Openings in the Robertson Center shall be 90-minute protected and the applicant shall <br />verify this with the Building Official and Fire Marshal. <br />6. The applicant shall either sprinkler the temporary modular classroom building or <br />provide direct exits from each classroom to the outside. The applicant shall verify <br />which method they are using with the Building Official and Fire Marshal. <br />7, Revised utility, grading, drainage, and erosion control plans shall be submitted to the <br />City Engineer for approval. <br />8. The applicant shall obtain all necessary permits from the Rice Creek Watershed <br />District, MPCA, and other governmental entities. Copies of such permits shall be <br />provided to the City. <br />9. Upon removal of the temporary modular classroom building the applicant shall <br />replant the area to include up to 50 caliper inches of trees to replace those removed <br />for installation of the building. <br />10. The applicant shall execute an Amendment to the Special Use Permit, drafted on <br />forms by the City Attorney, which limits the temporary modular classroom building's <br />presence on the campus to seven (7) years or completion of the Student Life Center, <br />whichever occurs first. ' <br /> <br />. <br /> <br />Commissioner Zimmerman asked with respect to condition 6, which spoke with <br />sprinkling the temporary classroom or providing direct exits from each classroom to the <br />