Laserfiche WebLink
<br />DRAFT <br /> <br />DRAFT <br /> <br />Attachment - D - 3 <br /> <br />(e <br /> <br />White Bear Lake PSAP Equipment Cost Estimates <br /> <br />1. Radio Control Consoles <br />Item Description Oty Each Cost <br />1A Console Work Position Electronics 2 $ 22,7.13.46 $ 45,426.92 <br />1B Central Electronics Bank 1 $ 74,539.00 $ 74,539.00 <br />1C Switches 0 0 $ 16,000.00 <br />10 Logging Audio Circuits 8 lot $ 38,054.00 <br />1E Backup RF Control Stations 3 $ 5,835.67 $ 17,507.01 <br />1F Subtotal $ 191,526.93 <br />1G Services 70% $ 134,068.85 <br />1H Total Radio Control Consoles $ 325,595.78 <br />2. Antenna Support Structure and link to Consoles ~ <br />Item . Description Qty Each Cost <br />2A Support Structure Structural Engineering $ 7,000.00 <br />2B Fiber or other Interconnect Means $ 10,000.00 <br />2C Microwave point-to-Point Link $ 150,000.00 <br />2D Total Support Structure and Link $ 167,000.00 <br />3. Ancillary Items <br />Item Description Oty Each Cost <br />3A Total Ancillary Items $ <br />4. Implementation Communications Engineering <br />4A Total Implementation Communications Engineering $ 24,000.00 <br /> <br />e <br /> <br />PSAPModeIComparisonl.8.doc 19 <br />