Laserfiche WebLink
<br />City of Arden Hills <br />2005 Assessment Policy <br /> <br />Appurtenances <br /> <br />e <br /> <br />Appurtenances such as sidewalks, street lighting, trees or other <br />landscaping features are often encountered during street improvement <br />projects. Appurtenances to new street construction, street reconstruction <br />or bituminous overlay improvements that are either existing or needed by <br />the City shall be included in the cost of the street improvement project. <br /> <br />Appurtenances constructed or provided in areas along an improvement <br />project where they do not currently exist, shall be one hundred percent <br />(100%) assessed to thc benefiting properties on a per unit basis. The cost <br />of these appurtenances shall be separated from the cost of the street <br />improvemcnt project. All costs of ornamental street lighting and/or any <br />lighting shall be one hundred percent (100%) assessed to the benefiting <br />propel1ies on a per unit basis. <br /> <br />Maintenance/Rehabilitation Proiects <br /> <br />a. Concrete Pavement Restoration <br />Concrete pavement restoration is a maintenance procedure funded by <br />the City. <br /> <br />b. Crack Sealing <br />Crack sealing is a maintenance procedure funded by the city. <br /> <br />. <br /> <br />c. Bituminous Seal Coating <br />Bituminous seal coating is a maintenance procedure funded by the <br />City. <br /> <br />d. Bituminous Surface Patching <br />Bituminous surfacing patching is a maintenance procedure funded by <br />the City. <br /> <br />A. Definitions & General Provisions <br /> <br />1. Assessment Rate <br /> <br />The assessment rate for any special assessment district is computed by <br />dividing the total assessable costs of such improvement by the total <br />number of assessment units. <br /> <br />Residential Example: <br />Roadway Project Cost <br />Drainage Improvements <br /> <br />$ 601,000 <br />$ 205,000 <br /> <br />. <br /> <br />2005 Assessment Policy Manual - Page 6 <br />