My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-23-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 08-23-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:41 PM
Creation date
11/14/2006 3:35:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br />2005 Assessment Policy <br /> <br />Appurtenances <br /> <br />e <br /> <br />Appurtenances such as sidewalks, street lighting, trees or other <br />landscaping features are often encountered during street improvement <br />projects. Appurtenances to new street construction, street reconstruction <br />or bituminous overlay improvements that are either existing or needed by <br />the City shall be included in the cost of the street improvement project. <br /> <br />Appurtenances constructed or provided in areas along an improvement <br />project where they do not currently exist, shall be one hundred percent <br />(100%) assessed to thc benefiting properties on a per unit basis. The cost <br />of these appurtenances shall be separated from the cost of the street <br />improvemcnt project. All costs of ornamental street lighting and/or any <br />lighting shall be one hundred percent (100%) assessed to the benefiting <br />propel1ies on a per unit basis. <br /> <br />Maintenance/Rehabilitation Proiects <br /> <br />a. Concrete Pavement Restoration <br />Concrete pavement restoration is a maintenance procedure funded by <br />the City. <br /> <br />b. Crack Sealing <br />Crack sealing is a maintenance procedure funded by the city. <br /> <br />. <br /> <br />c. Bituminous Seal Coating <br />Bituminous seal coating is a maintenance procedure funded by the <br />City. <br /> <br />d. Bituminous Surface Patching <br />Bituminous surfacing patching is a maintenance procedure funded by <br />the City. <br /> <br />A. Definitions & General Provisions <br /> <br />1. Assessment Rate <br /> <br />The assessment rate for any special assessment district is computed by <br />dividing the total assessable costs of such improvement by the total <br />number of assessment units. <br /> <br />Residential Example: <br />Roadway Project Cost <br />Drainage Improvements <br /> <br />$ 601,000 <br />$ 205,000 <br /> <br />. <br /> <br />2005 Assessment Policy Manual - Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.