Laserfiche WebLink
<br />City o.f Arden Hills <br />2005 Assessment Policy <br /> <br />the Arden Hills Pavement Management Program (PMP) (as found in the <br />Appendix) <br /> <br />e <br /> <br />10. Maintenance/Rehabilitation Proiects <br />a. Cold in Place Recycling and Repaving (CIRlRepaving) <br />Recycling of existing deteriorated pavements by pulverizing, mixing <br />with new asphaltic oils and compacting in place. New paving <br />materials are then placed ovcr the cold recycled pavement similar to a <br />standard overlay. <br /> <br />b. Bituminous Overlay <br />Placement of an additional bituminous laycr, generally one inch (I ") to <br />two inches (2") thick, ovcr an existing bituminous surfaccd street. <br /> <br />c. Concrete Pavement Restoration <br />Replacement of existing concrete panels that have detcrioratcd, <br />mudjacking panels to improvc rideability, and the filling of joints and <br />cracks with a petroleum based material to eliminate flow water to the <br />base below the surface. <br /> <br />d. Crack Sealing <br />Placement of petroleum based material in the cracks of a bituminous <br />surfaced street for the purpose of eliminating the flow of water from <br />the surface to the aggregate base material blow. <br /> <br />. <br /> <br />e. Bituminous Seal Coating <br />Placement of petroleum bascd material and aggregate on an existing <br />bituminous surfaced street for the purpose of filling cracks and <br />covering mild wear. <br /> <br />f. Bituminous Surfacing Patching <br />Repair or replacement of existing bituminous surfacing that has <br />deteriorated. <br /> <br />\\Earth\Finance\FinanceDirector\APTFI2004Assessment Policy: Revised 8/1104 <br /> <br />. <br /> <br />2005 Assessment Policy Manual - Page 24 <br />