My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-27-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 09-27-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:44 PM
Creation date
11/14/2006 3:35:55 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />remain in place. Impervious surface will increase by approximately 1.1 acres due to consiruction of <br />turn lanes, median area, and sidewalk on the east side of Lexington. <br /> <br />The stann sewer capturing flow from the north half of the project is cOllilected to the storm sewer <br />system in Highway 96 is conveyed to existing ponding provided in Snail Lake Regional Park east of <br />Lexingion Avenue. That treatment basin overflows to natural wetlands adjacent to Snail Lake. The <br />stonn sewer system serving the south half of this segment will discharge flows to the dual basins north <br />and south of Victoria Street on the east side of Lexington. These treatment basins overflow to Karth <br />Lake Otl the west side of Lexington. <br /> <br />Currently a portion of Lexington A venue runoff is discharged directly to Karth Lake. Upgraded stonn <br />sewer features on the south half ofthis segment will redirect those discharges to ponding on the east <br />side prior to reaching Karth Lake. <br /> <br />'\'ii.::nut" <br /> <br />'')'> 2;)('4 <br /> <br /> <br />I" <br />
The URL can be used to link to this page
Your browser does not support the video tag.