<br />Estimated Cosl Participation Summary
<br />Lexington Avenue Reconstruction - Cummings Park Drive to Highway 96
<br />SAP. 62-651-38
<br />22-Sep-04
<br />
<br />EXHIBIT A
<br />
<br />
<br /> Roadway 1,426,379.00 1,426,37900
<br /> Signal System 241,000.00 176,725.00 62,275.00 2,000.00
<br /> Storm Sewer 179,080.00 179,080.00
<br /> Ponds 7,405.00 7,405.00
<br /> Curb and Gutler 127,915.00 82,979.00 22,468.00 22,468.00
<br /> Concrete Sidewalk 60,100.00 15,025.00 45,075.00
<br /> Median Sidewalk 75,135.00 18,783.75 28,175.63 28,175.63
<br /> Bituminous Path 31,000.00 31,000.00
<br /> Structural Walls 225,000.00 225,000.00
<br /> Modular Walls 76,600.00 19,150.00 21,831.00 35,619.00
<br /> Fencing 8,750.00 8,750.00
<br /> Traffic Control 20,000.00 17,200.00 1,400.00 1,400.00
<br />. Signing/Striping 10,000.00 10,000.00
<br />Water Main 100,000.00 100,000.00
<br /> Mobilization 80,000.00 68,800.00 5,600.00
<br /> Total Const.Cost 2,668,364.00 2,286,276.75 195,262.62
<br /> Engineerin 640,407.36 548,706.42 46,863.03
<br /> 191,000.00 113,000.00